Main technical performance indicatorsAdapt to the site: the bottom of the canal, the slope of the canal, the highway, etc. can be used. Equipment specifications: According to the width of the working surface, the length of the fuselage can be customized.
Equipment structure and working principle
The bottom lining machine consists of four parts: the feeding machine, the spreading machine, the screeding machine and the receiving frame. The loading machine is placed on the slope of the channel, the frame is connected with the booth of the spreader, and there is a walking wheel at the bottom of the frame, which does not need to be towed and automatically controls walking. The spreader, the trowel and the receiving frame are placed in parallel at the bottom of the channel and at a certain distance in the middle. The material is placed in the hopper of the loading machine by the tanker, and is fed into the hopper of the spreading machine with the belt, and then fed along the belt of the spreading machine. The material is introduced into the storage hopper through the baffle plate on the belt, and the vibrating plate is spread by the lower part of the rack. Evenly, it is smoothed by a trowel, and the face frame is manually closed.
Molding machine features:Hydraulic propelling walking device, good molding effect. High-power vibrator, high density, smooth construction and surface. Generator, stable, low fuel consumption, low cost of use. The failure rate of the whole machine accessories is low. The control box adopts button control, which is easy to operate. The hopper is equipped with a screw feeding device, and the pre-concrete is accumulated.
Paremeter
Speed material
|
1.25mmin
|
Lining walking speed
|
1.2m~1.5m/min
|
lining speed
|
5-11m/h
|
thickness lining
|
60-160mm
|
Total installed power
|
70.5kw
|
Product use
|
Channel forming
|
![1-.png]()
![4.png]()
![5 .png]()
![6-.png]()
![u+.png]()
![V+.png]()
![1 (1).png]()
![1 (2).png]()
Packaging & Shipping
Packaging Details
1. Out package: Standard marine export plwywood cases;
2. Innner package:Stretch film and plastic film for humidity;
3. Customized according to your requirement.
Delivery Time
Within one week
Shipping
Port: Tianjin, Qingdao, Shanghai or other ports according to your requirements.
Sea freight: FOB/CIF/DDU quotation are all available.
Transport method: By logistics; by automobile; by train; by shipping; by air etc.