Автоматическая машина для запекания кофе в зернах 1-30


Поделиться:


Цена:2 500,00 $*

Количество:



Описание и отзывы


Трекер стоимости

Месяц Минимальная цена Макс. стоимость
Sep-18-2025 2975.22 $* 3124.78 $*
Aug-18-2025 2950.62 $* 3098.83 $*
Jul-18-2025 2475.86 $* 2599.73 $*
Jun-18-2025 2900.56 $* 3045.44 $*
May-18-2025 2525.89 $* 2651.32 $*
Apr-18-2025 2850.31 $* 2993.51 $*
Mar-18-2025 2825.23 $* 2966.47 $*
Feb-18-2025 2800.84 $* 2940.96 $*
Jan-18-2025 2775.93 $* 2914.32 $*

Характеристики



Product Description


Automatic coffee beans processing machines automatic coffee beans roaster machine

Features :
1.Continuous operation provides convenient product loading and unloading without stopping the machine.
2.Fast direct gas heating.
3.Baking temperature can be preset. When the temperature is reached, a buzzer sounds to alert the operator.
4.Baking time can be set as desired according to product variation.
5.Electronic temperature display for accurate temperature control.
6Equipped with a sample picking handle, permitting for the checking of baking conditions at anytime during operation.
7.Designed for baking and cooling operations.
8Suction type air cooling system filters and exhausts dust whiles preventing product scorching.
9.Equipped with agitator to ensure superior baking uniformity, good taste of product, and to eliminate burning.


Model
Voltage
Power


Gas consumption
Dimensions
Weight
1kg/batch
220v/380v
0.2kw
0.5kg/h
860*740*940mm
100kg
3kg/batch
220v/380v
0.5kw
0.7kg/h
1420*910*1410mm
150kg
6kg/batch
220v/380v
1.25kw
1.2kg/h
1500*600*1550mm
180kg
10kg/batch
220v/380v
2.2kw
1.5kg/h
1650*1050*1700mm
260kg
15kg/batch
220v/380v
3kw
2kg/h
1800*1100*2000mm
450kg


Projects Cases


3kg/batch coffee roaster machine for Canada in 2017
10kg/batch coffee roaster machine for Italy in 2018
30kg/batch automatic coffee roaster machine for France in 2020


Packing & Delivery




Our Service


Pre-Sales Service

* Inquiry and consulting support. 

* Sample testing support. 

* Accurate quotation and technology analysis.

* Suggestions for related products and projects.

* View our Factory.

After-Sales Service

* Help installation and training.

* Technical support online all the time

* Repair or change new spare parts

* Employee working at factory long term

* Improve technology and equipment design for buyers



Certificates




Drawing and layout of some systems


complete layout of workshop
complete processing line:
cleaning-grading and steaming-shelling-drying and humdifier-peeling and grading-sorting-cleaning-picking-sterilizing-flavoring and packing machine
layout of automatic shelling line
automatic shelling and separating line are composed of more than 20sets of single machines and accessories. elevators, shelling, vibrator sieve, centrifual separator, blowing separator, rolling separator, etc.
layout of automatic peeling line
automatic peeling line is composed of hopper, elevator, brushing, peeling ,drum grading and rolling grading machine. peeling rate and whole kernels rate are 90-95%. work with screw air compressor.


Customer Photos




Client from Pakistan
Client from Senegal
Client from Cameroon


FAQ


What would be the min. And max. Lifetime of the production lines and do they have examples from the past?
at least 10 years. Some Client for Kenya brought 12 sets machine in 2010, including semi- automatic shelling machine, and other single machines. Except for supply of spare parts with the initial shipment, there were only extra 2 shipments by DHL for spare parts during their usage till now.


What package can be provide, e.g. besides the sole equipment supply also things like installation/supervision, staff training, service & maintenance?
We shall send two-three technicians to the site to provide guidance on installation and debugging and the training of operators. The technicians’ round-trip air tickets, visa application fees and personal insurance are paid by the customer. Besides, the customer should provide free accommodation for the technicians while they are abroad. The customer should pay each technician 100usd/day.


What is the spare part supply and how long will spare parts be available? Would a supply of parts that have a higher wear & tear (according to their experience) be possible already with the initial shipment?
Lead time of spare parts: 7-15 days
Transportation way: By DHL.
We would have a supply for the parts of higher ware & tear with the initial shipment for free, the quantity as per corresponding sets of equipment.


Contacts






Похожие товары

Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com