Горячего погружения гальваники Q235 стальная рама перемещение оцинкованная Layher башня Ringlock


Поделиться:


Цена:25,00 $ - 35,00 $*

Количество:



Описание и отзывы


Трекер стоимости

Месяц Минимальная цена Макс. стоимость
Aug-16-2025 32.26 $* 33.85 $*
Jul-16-2025 26.18 $* 27.1 $*
Jun-16-2025 31.17 $* 32.15 $*
May-16-2025 31.32 $* 32.9 $*
Apr-16-2025 25.62 $* 26.73 $*
Mar-16-2025 31.1 $* 32.77 $*
Feb-16-2025 30.38 $* 31.45 $*
Jan-16-2025 30.77 $* 31.71 $*

Характеристики


Product Description

1.One set of Ringlock Scaffolding usually include 4 standards and 8 ledgers.

2.Ringlock Scaffolding is easy and quick  to install and strip.which can save your time.

3.Ringlock Scaffolding provides high loading capacity while its structure is quite flexible.

4.All the Ringlock Scaffolding parts are dealt with CO2 arc welding, the surface is galvanized. As a result, it is more durable and has a longer working life.

5.There is small lock pin on Ringlock verticals to restrict the cups from moving out. so you don't worry to lost ancillaries.

Name
Spec(mm)
Weight  (kg)
Material




Standard
48.3*3.25*500
2.25
Q345
48.3*3.25*1000
4.51
Q345
48.3*3.25*1500
6.76
Q345
48.3*3.25*2000
9.02
Q345
48.3*3.25*2500
11.27
Q345
48.3*3.25*3000
13.53
Q345
Name
Spec(mm)
Weight(kg)
Material



Ledger
48.3*3.25*1000
4.67



Q235
48.3*3.25*1200
5.39
48.3*3.25*1500
6.47
48.3*3.25*1800
7.56
48.3*3.25*2000
8.28
48.3*3.25*2500
10
Name
Spec(mm)
Weight(kg)
Material



Diagonal Brace
48.3*3.25*1858
8.16



Q235
48.3*3.25*2042
8.82
48.3*3.25*2250
9.58
48.3*3.25*2401
10.12
48.3*3.25*2804
11.56
Accessories
Name
Spec(mm)
Weight(kg)
Material
Surface
Base Collar
48.3*3.25*300
1.65
Q235
galvanized



Wedge Pin
Rosette
Diagonal Head
Ledger Heas
Detailed Images
How to install
Application
Packing&Shipping
Standard Export Packing
FAQ
 - - 1. Q: What's your MOQ(minimum order quantity)?
A: One full 10set.
- - - 2. Q: What's your packing methods?
A: Packed in bundle or bulk (customed is accepted).
- - - 3. Q: What's your payment terms?
T/T 30% in advance by T/T ,70% will be before shipment under FOB.
T/T 30% in advance by T/T ,70% against the copy of BL under CIF.
T/T 30% in advance by T/T ,70% LC at sight under CIF.
- - - 4. Q: What's your delivery time?
A: 15-28 days after received the advance payment .
- - - 5. Q: Are you manufacturer or trader?
A: We are the manufacturer of construction materials for decade years ,TSX Group do domestic market and export business.

Похожие товары

Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com