Поделиться:
Месяц | Минимальная цена | Макс. стоимость |
---|---|---|
Sep-15-2025 | 1190000.61 $* | 1249500.51 $* |
Aug-15-2025 | 1180000.31 $* | 1239000.78 $* |
Jul-15-2025 | 990000.86 $* | 1039500.12 $* |
Jun-15-2025 | 1160000.78 $* | 1218000.42 $* |
May-15-2025 | 1010000.32 $* | 1060500.36 $* |
Apr-15-2025 | 1140000.47 $* | 1197000.68 $* |
Mar-15-2025 | 1130000.0 $* | 1186500.65 $* |
Feb-15-2025 | 1120000.26 $* | 1176000.3 $* |
Jan-15-2025 | 1110000.41 $* | 1165500.5 $* |
Natural gas is one of the world's most important sources of energy. Today approximately 30% of the world's energy demand is derived from natural gas. Natural gas liquefaction is an important part of natural gas processing industry. The liquefaction process involves removal of certain components, such as dust, acid gases, helium, water, and heavy hydrocarbons, which could cause difficulty downstream. The natural gas is condensed into a liquid to approximately −161 °C (−260 °F).
1.peak load regulation liquefaction plant
2.oilfield associated gas
3.remote gas well
4.chemical exhaust gas recovery, etc.
1.Blocking structure design of LNG, quick installation on site.
2.LNG plant processes including nitrogen cycle refrigeration, MRC cycle refrigeration, high pressure throttling.
3.Wide application with whole air cooling/water cooling structure.
4.Safe design and operation according to ExdIIBT4.
5000Nm3/d | 10000Nm3/d | 20000Nm3/d | 30000Nm3/d | 50000Nm3/d | 100000Nm3/d | ||
LNG Output | Nm3/h | 125~230 | 250~500 | 500~900 | 800~1400 | 1200~2300 | 2400~4600 |
LNG Temperature | ℃ | -161 | -161 | -161 | -161 | -161 | -161 |
Process | MRC/ Nitrogen Circle | MRC/ Nitrogen Circle | MRC/ Nitrogen Circle | MRC/ Nitrogen Circle | MRC/ Nitrogen Circle | MRC/ Nitrogen Circle |
Q:Can it be in roll?
A:Both roll and sheet.
Q: How to ensure the cargo quality?
A:We will supply bulk sample before shipping.They can represent the cargo quality.
Q:If the MOQ is too high ?
A:We need to dye the fibre or wool firstly ,then produce it with the big machine , if the order it too small ,our cost will be too high .But if we have stock , we can find for you.
Q:How about the delivery time?
A:Production lead time after receipt of 30% T/T deposit payment: 14-30 days.
Q:What kind of payments do we accept?
A:T/T, L/C at sight, Cash are acceptable.
Q:Do you charge the sample?
A: (1)Samples in stock can be offered free and delivered in 1 day and courier charge will be paid by buyer.
(2)Any special requirements to make a sample, the buyers need to pay appropriate sample charge.
(3)However, the sample charge will be refunded to the buyer after formal orders.
Q:Can you produce according to customers' design?
A:Sure, we are professional manufacturer, OEM and ODM are both welcome.
Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com