Поделиться:
Месяц | Минимальная цена | Макс. стоимость |
---|---|---|
Sep-16-2025 | 144347.21 $* | 151564.28 $* |
Aug-16-2025 | 143134.75 $* | 150291.92 $* |
Jul-16-2025 | 120087.31 $* | 126091.55 $* |
Jun-16-2025 | 140708.73 $* | 147743.56 $* |
May-16-2025 | 122513.44 $* | 128639.49 $* |
Apr-16-2025 | 138282.19 $* | 145196.98 $* |
Mar-16-2025 | 137069.83 $* | 143922.28 $* |
Feb-16-2025 | 135856.59 $* | 142649.77 $* |
Jan-16-2025 | 134643.37 $* | 141375.60 $* |
The cut to length line is used to get flat sheets from steel coils after 7-8 working procedures.
The total line is CNC control.
After operator put coil onto the loading cart, the following procedures will finish automatically.
The touch screen in the controlling table will allow operator to input parameters required.
The total line is easy to operate.
Such a line normally containing below working procedures:
1.unloading cart (optional)
2. uncoiler
3. shoveling and pressing device
4. correcting facility
5. pinching
6. leveling (four high structure)
7. length fixing
8. shearing
9. stacking (optional)
10. electric control system
11. hydraulic control system
1. Our factory has decades of experience for metal coil and sheet processing machines production.
We have professional engineer team for technical support.
Over 30 years practical installing and testing experience accumulated makes sure the good running for machines.
2.Our QC department tracing every procedures during machine making to guarantee the qualified final output.
3. The electric and hydraulic elements using in our machines are all famous and long cooperated in China.
They can work stable and have long working life.
\t | \t |
\t | \t |
\t | \t |
\t | \t |
\t | \t |
\t | \t |
This uncoiler part is used to open the coil.
For 6-25 mm thickness coil, normally uses symmetric structure of uncoiler.
This structure can bear 30 ton coil max.
This device is used to guide the head of the coil into pinch roller smoothly.
This facility can protect the coil run without deviation.
It is located before the leveling machine.
There is one pair of pinching rollers before the leveling machine.
The leveling machine is four high structure, 5 pcs of rollers in all (3 up 2 down).
This part of machine can flatten the coil from uncoiler and the send the coil into the shearing machine to get plates in required length.
After the length fixing facility, the shearing machine can cut the coil into required length.
So customers can get plates in the end, such as 1m, 2m, 3m, 4m, 5m, 6m etc.
All figure can input into PLC, the total machine will run automatically.
This controlling table structure is designed by our engineers. It is really smart and practical.
PLC and all controlling buttons are in the table.
Operator can input figures according to real requirements and press start button to make the total line work.
Our Company
Bronx Machinery designs and builds high quality metal plate and coil processing machines with over 20 years manufacturing experience. Our factory has over 10000 square meter area and over 50 employees.
Our main production including production lines such as cut to length line, slitting line, embossing line, rolling mill, corrugating line, tube mill etc.
And machines such as shearing machine, bending machine , press brake, rolling machine, hydraulic press, uncoiler, H beam straightener, leveling machine etc.
We've successfully helped customers build processing center for stainless steel. In the center, the processing machines including SS polishing machine, SS embossing machine of roller structure (thickness below 6mm) and hydraulic structure (thickness below 12mm), SS leveling machine, and 8K oil rewinding line.
Our customers are from various countries like Netherland, Poland, Russia, Kazakhstan, India, Vietnam, Pakistan, Nepal, Qatar, Iran, Mexico, Brazil, Uganda, South Africa etc..
Our processing equipment
Testing equipment
1. collect all requests
2. feedback asap
3. offer proper specifications
4. factory inspection available
1. operator training free of charge
2. 12 months warranty
3. supplier offer service and units free of charge for not manual caused damage within warranty
4. response within 12 hours by phone or video
90-100 days after confirming order,detail delivery date should be decided according to production season and order quantity.
(1) What is your advantages?
A1: More than 20 years experience in manufacturing and R&D, we are professional and humanized .
A2: Since we are a manufacturer, not a trading company, we can provide good quality pre and after sales service on time.
A3: production efficiency: 3-4 line per month
(2) Do you have after sales support?
Yes, we have a 15 persons professional installation and testing team. And will provide service for you during the machine life time. Any problem, contact us freely and we will try to solve asap.
(3) How to visit your company?
Our factory is located in Haian city, near Shanghai. From Shanghai to Haian, there are many schedules of direct bus. It will cost only 3 hours by bus.
Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com