Автомобильная аккумуляторная свинцовая плавильная печь cupola сделано в Китае для


Поделиться:


Цена:3 766 895,00 ₽ - 9 040 548,00 ₽*

Количество:



Описание и отзывы


Трекер стоимости

Месяц Минимальная цена Макс. стоимость
Aug-16-2025 4783957.4 $* 4879636.82 $*
Jul-16-2025 3879902.90 $* 3957500.29 $*
Jun-16-2025 4708619.47 $* 4802791.46 $*
May-16-2025 4670950.66 $* 4764369.72 $*
Apr-16-2025 3729226.24 $* 3803811.97 $*
Mar-16-2025 4595612.8 $* 4687524.20 $*
Feb-16-2025 4557943.48 $* 4649102.80 $*
Jan-16-2025 4520274.94 $* 4610679.64 $*

Характеристики

Car battery lead melting cupola furnace made in china for sale

lead melting cupola furnace

 

Product description :

 

The cupola furnace is an important equipment for melting cast iron in casting production. After casting the cast iron block into molten iron, it is poured into the sand mold to be cooled and then unpacked to obtain a casting.

 

lead melting cupola furnace

 

 

The cupola is a vertical cylindrical melting furnace, which is divided into a front furnace and a rear furnace. The front furnace is divided into an iron outlet, a slag outlet, a furnace hearth and a bridge. The afterburner is divided into three parts, the top furnace, the waist furnace and the hearth.

 

lead melting cupola furnace

 

 

The waist furnace is separated from the hot air pipe, and after the furnace is closed, it is sealed with mud. The top furnace is a heat exchanger. Mainly used in the production of cast iron parts, but also used in conjunction with converter steelmaking, because the top of the furnace is upward, it is called the cupola furnace.

 

Working Process :

 

lead melting cupola furnace

 

 

Raw materials are melting in cupola furnace with water cooling system. Lava flows out from the side hole at lower part of cupola furnace, and then lava flows through fix launder, and flows into movable launder and falls on centrifuge. Lava will be fiberized under the centrifugal force produced by centrifuge rotating at high speed and high speed air flow from air ring. There is level controller installed at the top of cupola furnace, it can keep the cupola furnace material in level and control the temperature of waste gas in steady. The composition of waste gas contains: CO2, CO, SO2 and dust.

 

Car Battery Cutting And Smelting Plant:

 

The whole line of Car Battery Cutting And Smelting Plant is environmental protection. Firstly the scrap lead acid battery will be separated by the "Battery Separating machine". The final produts of separation section is plastic, lead, acid. The coarse lead can be refined by Smelting Section. And then you can choose the Cupola Furnace to get the refined lead ingot if you want to get deeply recycle. As for the Smelting Section, there is also Air Pollution Purify System to meet the environmental protection policy.

 

lead melting cupola furnace

 

Parameter:

ModelCapacity (24 hours)
RQ-220 ton
RQ-440-50 ton
RQ-660-70 ton
RQ-880-90 ton
RQ-10100-120 ton
Working Performance
Raw MaterialLead Plate Separated From Lead Acid Battery
Final ProductLead Ingot
 
Car Battery Cutting And Smelting Plant Machine Feature:

1. High water discharge rate, quick production.
2. Automatic feeding, automatic production.
3. Maintenance costs are low, almost without maintenance.
4. The wind blows at most once a day.
5. 12-hour production, 2 people is enough.
6. Can seal the furnace, do not produce during the day, only production at night.
7. Automatic circulation cut off water and power, do not burn the furnace.
8. Energy-saving and environmental protection, efficiency is high, round furnace - no dead Angle.
9. Self-flowing lead, lead water flows directly into the mold and is molded once and for all

 

FAQ:

 

1. CAPACITY?

---Our minimum capacity is 20 mt/d.we can customize the capacity as your demands.

2. How many reducing lead ingot can be produced by investing a ton of raw materials(car battery)?

---One ton Car Battery can produce about 600 kg Reducing lead ingot.

3. Output Lead Ingot Shape

---Ingot

4. now we using for Furnace oil, your one Burner system gas or Oil…?

---Its fuel is coke.

5. Coke usage

---160 kg coke can burn out 1 ton finished product

6. For the installation how many days we need?

---About 13 days

 

Contact

Contact

 

Any more questions you can inquiry me ! Welcome to our factory for visit!

 

Contact Person :                                   Yorke Sun

Phone/Whatsapp/Wechat:         +86 17737162834

Emai:                                  yorke(at)recycle999.com

ADD:                  Zhengzhou, Henan, China (Mainland)

 

 

 

 

Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com