Машина для производства цветочной пены и химическая


Поделиться:


Цена:*

Количество:



Описание и отзывы


Трекер стоимости

Месяц Минимальная цена Макс. стоимость
Sep-17-2025 0.42 $* 0.29 $*
Aug-17-2025 0.37 $* 0.23 $*
Jul-17-2025 0.35 $* 0.15 $*
Jun-17-2025 0.52 $* 0.84 $*
May-17-2025 0.36 $* 0.58 $*
Apr-17-2025 0.86 $* 0.90 $*
Mar-17-2025 0.24 $* 0.30 $*
Feb-17-2025 0.93 $* 0.99 $*
Jan-17-2025 0.65 $* 0.48 $*

Характеристики


Floral Foam Production Machine And Chemical Formula

Product Description

Welcome! Comprehensive range of services for you!

We are specializing in exporting floral foam production line equipment.

 

The complete production process

put the material to the 5000L reactor kettle,start heating ,when the temperature reach about 100 degrees,it will produc gases,and the gas will into the separation column.

 

after part be cooled by the separation column, the rest gas into horizontal condenser,then condenser will cooling the gas ,after all the water and gas will into the catchment device.

 

the catchment device,will separate material back to reactor kettle,and exclude the water.(the process may be last about fifteen to twenty hours)

 

during the reaction process,in order to improve the speed, can extracting vacuum,when reach the suitable time, sampling, assay viscosity,if meet the requiment, then cooling.


when the temperature reach 130 degrees,put the raw materials to dilute kettle,and add Xylene (this kind of material) to dilute kettle, diluting , cooling ,then make the prodction you need.

 

Different

the complete production line delete the distribution ark and heating pump ,but add the boiler,after the oil in thermal oil furnace is heat by the gas, through the oil stick into the reaction kettle interlayer cycle,then back to the thermal oil furnace go on heating, recycling again, it is such a heating principle as the heater.
Marked

about the carbon buffer tank ,elbow ,and other components,we are provide them free.

2.jpg

 

About foam machine

 

a. reactor: low speed mixing, electrical heating, automatic temperature control


b. mixer: high speed mixing, with mixing tank

c. foaming mould: water cycle, electrical heating, automatic temperature control

d. foam cutting machine: vertical cuutingmachine and horizontal pushing machine

 

About floral foam plants

 

shapebrick
 size80*110*230 mm
colorred, green, blue
PH valueabout 6.8-7
water absorbtionabout 30-60s
warter retaining timeabout 7-10 days
dry     weight50g
wet     weight1.5-2kg
Product Display

Pictures Show

_meitu_00.jpg_meitu_45.jpg 

More Products

Interested Click It

_meitu_0.jpg

 
Company Information

Company

      Located in Laizhou city, the intersection of Yantai, Qingdao and Weifang, the Laizhou Shahe Yuanda Chemistry & Machinery Factory enjoys the beautiful and rich Bohai Bay. Be with convenient transportation as well as favorable geographical location, it is a perfect place for both trade and office place.

We are an integrative enterprise incorporated with scientific research development, manufacturing, marketing, and sales-after services. Featuring reasonable structure, durability, easy operation and maintenance, with a number of technology management specialists who have many years experiences in machinery design and development, we are committed ourselves to satisfy various demands from our customers. We are rewarded as City-Level Advance Enterprise; Superfine Reputation Enterprise and reached the ministrys quality control standard. Our products have been distributed all around the country and obtained high credit from our costumers.

Led by our director, Liu Xiaobin, we eliminated any worries from our customers by building and completing a full quality guaranteed system, which covering manufacturing, marketing, and after-sale service.
Factory director, Liu Xiaobin, together with the whole staff welcomes all friends from all field, and looks forward to the most sincerely co-operation. Together lets create a splendent future in the 21st century!

Packaging & Shipping

Packaging & Shipping

_meitu_1.jpg 

Certifications

Certifications

123.jpg 

FAQ

FAQ 

     About Delivery Time

Q----What’s the delivery term for making business with us?A: Usually we send the shipment in FOB term.However, the terms of CIF are acceptable which depend on the preference of clients.

     About Lead Time

Q----What’s the lead time after placing the order?

A: Usually it takes about 15~30 days after we received your confirmation.

However, it would depend on our production line schedule(the timing clients place order)and the complication of the item.

     About Payment Term

Q----What’s the Payment Term?

A: By T/T in Advance, or Irrevocable L/C as Sight.  


Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com