Поделиться:
Месяц | Минимальная цена | Макс. стоимость |
---|---|---|
Sep-19-2025 | 0.64 $* | 0.79 $* |
Aug-19-2025 | 0.21 $* | 0.35 $* |
Jul-19-2025 | 0.62 $* | 0.37 $* |
Jun-19-2025 | 0.49 $* | 0.53 $* |
May-19-2025 | 0.20 $* | 0.80 $* |
Apr-19-2025 | 0.9 $* | 0.33 $* |
Mar-19-2025 | 0.12 $* | 0.21 $* |
Feb-19-2025 | 0.16 $* | 0.79 $* |
Jan-19-2025 | 0.84 $* | 0.70 $* |
Weifang Sehenda Blow Molding Machine
5000L Plastic water tank blow molding Machine
Application:
This Blow Molding Machine can produce plastic blow molding products such as wter tanlk,pallets, fuel tank of vehicle, chemical container etc. The maximum container volume is 10000L.
Machine Features:
-The screw adopts IKV design, with high potency melt to make sure the material well mixed.
-Adopt frequency control of motor system to reduce the power consumption.
-Adopt Parison thickness controller Moog 100 points, to make thickness even and adjust the tank weight in big span.
-Fully automatic, easy to operate, two women can operate machine, whole production line need 3 or 4 person only.
-High output versus Roto molding machine
-Save raw material 25% - 35% versus Roto tanks.
-Perfect impact resistance versus Roto tanks.
-Multi layers co-extrusion.
-The mechanical arm can take out the product automatically.
Application | Water tank, septic tank, plastic pallet, chemical tank, road barrier, frp vessel, IBC, L-ring drum, floating dock, fish tank and other customer-made products |
Capacity | Tanks and containers from 200 to 5,000 liter, pallet up to 1600*1800 mm |
Layers | 1 layer, 2 layer, 3 layer, 4 layer |
Material | HDPE, HMW-HDPE, Recycle material |
Features |
|
Packed in container, good enough for sea worthy transportation;
We also can arrange the shipment from our factory to customer's factory.
1). Machine and all other things required for the production;
2). Door to door Shipment;
3). Training at buyer's site free of charge for 2 weeks.
4). 1 year warranty and life time technical support freely;
a) The Seller will dispatch an engineer and translator against the requests of the Buyer to install and adjust the machine for 10 days in the Buyer’s factory.
b) The Buyer need to inform the Seller 15 days in advance.
c)The Buyer should pay for the engineer and translator’s visa application cost, round- tickets, food & accommodation before their departure.
Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com