Product Description
Material Handling Steel Ladle Top Running Eot Crane For Steel Fusion Work
[ Foudry Crane / Cast Crane / Ladle Crane ] | |
|
|
Foundry crane is the main equipment during the steelmaking process. The crane is applicable in steelmaking workshop to transfer liquid steel or metal under the high temperature, dusty working environment. With the develpment of steel industry, the foundry crane need to work more frenquently. So the foundry crane must be safety and reliable, and even when some parts demaged, Our crane can keep the ladle not falling or rollover. The framework of our crane is simple, and can be maintained very quickly in order to ensure the steelmaking production continuously. Now we can supply foundry crane capacity up to 630 ton. Also according to customer's requirement we can provide special design. | | ![Material Handling Steel Ladle Top Runing Eot Crane For Steel Fusion Work]() |
|
|
Strong Drum & Trolley Showing | |
|
|
|
![Material Handling Steel Ladle Top Runing Eot Crane For Steel Fusion Work]() ![Material Handling Steel Ladle Top Runing Eot Crane For Steel Fusion Work]()
|
|
|
- Reasonable structure
- Favorable performance
- Soft starting and stopping
- Safe and reliable traveling
- Low noise, commodious cabin and good view
- Convenient maintenance, excellent exchangeability for parts and components
- Energy saving, reduce energy consumption
- Using transducer for travelling or traversing crane to realize step speed or stepless speed change
- Primer and finishing paint
- Crane structure: steel box type
|
![Material Handling Steel Ladle Top Runing Eot Crane For Steel Fusion Work]() |
|
|
| | |
- Overloading protection
- Top quality long time bearing polyurethane materials buffer
- Crane traveling and cross limit switch
- Voltage lower protection function, reduce energy consumption
- Main lifting motor with thermal protection
- Hooks with latch
- Rubber buffers
- Protective earthing
- Sub-assembly characteristic are tested before assembly
- Emergency stop system, current over-load protection system, Excellent exchangeability for parts and components
|
| | |
|
| | |
Double Girder Foundry Crane | | |
| | |
![Material Handling Steel Ladle Top Runing Eot Crane For Steel Fusion Work]()
|
| | |
Capacity(t) | Lifting Height(m) | Speed (m/min) | Total Power (kw) | Recomend Rail (kg/m) | Main hook | Aux hook | Main hook | Main Hook | Aux. hook | Trolley | Crane | 16/3.2 | 12 | 15 | 2.5~9 | 9 | 20~38 | 30~70 | 19.4~49.5 | 52.8 | 20/5 | 27.5~62.5 | 25/5 | 28.1~72.9 | 32/5 | 15 | 17 | 30~80 | 29.7~110 | 63.69 | 40/5 | 2~9 | 30~70 | 30.5~111.5 | 50/10 | 2~7 | 9 | 46.4~130 | 63/10 | 21 | 23 | 1.5~7 | 9 | 46.4~157 | 75/20 | 26 | 28 | 1.7~7 | 7 | 18~30 | 81~184 | 88.96 |
|
| | |
Four Girder Foundry Crane | | |
| | |
![Material Handling Steel Ladle Top Runing Eot Crane For Steel Fusion Work]() |
| | |
Professional Foundry Crane YZS Model 125/32~320/80T Four beam Cast Bridge Crane | Lifting capacity(t) | 125/32 | 140/32 | 160/32 | 180/50 | 200/50 | 225/65 | 240/80 | 280/80 | 320/80 | Working class | A7 | Span(m) | 19 | 19 | 27 | 28.5 | 28 | 27 | 22 | 22 | 24.5 | Lifting height(m) | Main hook | 24 | 22 | 25 | 27 | 26 | 32 | 25 | 29 | 28 | Auxiliary hook | 26 | 24 | 26 | 29 | 26 | 34 | 27 | 29 | 32 | Speed | Main hook | 7.6 | 7.8 | 9.8 | 7.5 | 6 | 11 | 7 | 12 | 7.5 | Aux. hook | 9.7 | 9.7 | 12 | 10 | 10 | 11 | 9.6 | 10 | 10 | Main trolley | 38 | 36 | 43.5 | 40 | 41 | 41 | 35 | 40 | 29 | aux.trolley | 39 | 37.5 | 43.5 | 38 | 38 | 39.5 | 38 | 40 | 39 | crane | 76 | 73 | 84 | 80 | 78 | 84 | 80 | 80 | 58 | Max wheel load(KN) | 505 | 535 | 485 | 525 | 530 | 550 | 545 | 735 | 750 | Steel track recommended | QU120 | Power source | 380V 50HZ 3-phase A.C. |
|
| | |
![Material Handling Steel Ladle Top Runing Eot Crane For Steel Fusion Work]() ![Material Handling Steel Ladle Top Runing Eot Crane For Steel Fusion Work]() ![Material Handling Steel Ladle Top Runing Eot Crane For Steel Fusion Work]()
![Material Handling Steel Ladle Top Runing Eot Crane For Steel Fusion Work]()
![Material Handling Steel Ladle Top Runing Eot Crane For Steel Fusion Work]() ![Material Handling Steel Ladle Top Runing Eot Crane For Steel Fusion Work]()
|
Free inquiry
Light to heavy duty 10 ton double girder overhead crane for workshop industry lift equipment
In order to make a very quick offer and saving your waiting time, It's better to fill the information below. Copy and send us the information together with the enquiry.
![Material Handling Steel Ladle Top Runing Eot Crane For Steel Fusion Work]()
Load Capacity, ton: | (_______) | Span, S, m: | (_______) | Lift Height, H, m: | (_______) | Voltage: | (_______) | Duty Class: | (_______) | ? Hours per day: | (_______) | Control way: | (_______) | Lift Speed: | (_______) | Cross & Long travel speed: | (_______) | Rail supply needed | (_______) | Power supply system needed | (_______) | Your nearest port: | (_______) |
| {Tips: 5 ton, 10 ton, 16 ton, 20 ton, 30 ton, 40 ton, 50 ton up to 550 ton} |
{Tips: 6m ~40m} |
|
{Tips: 380V, 50Hz, AC, 3-phase or please note} |
{Tips: A5, A3, If you don't know, please fill the follow} |
|
{Tips: Remote control, cabin control or pendent control } |
{Tips: Single speed, double speed, or stepless speed} |
{Tips: Single speed or stepless speed} |
{Tips: If yes, please note the Long travel length} |
{Tips: If yes, please note the Long travel length} |
{Tips: We quote CIF price need the port. FOB price please note FOB} |
If your workshop roof is very low, Its better to send us a drawing, a sketch or show us datas and then our Engineer can work out a full suitable solution just for yours.
Looking forward your kindly inquiry and hope to help your strong business in near future!