Китай стальная бетонная опалубка гидравлическая Автоматическая для скалолазания строительства моста похожая


Поделиться:


Цена:4 999,00 $ - 5 999,00 $*

Количество:



Описание и отзывы


Трекер стоимости

Месяц Минимальная цена Макс. стоимость
Aug-19-2025 6349.96 $* 6476.6 $*
Jul-19-2025 5149.57 $* 5252.5 $*
Jun-19-2025 6249.97 $* 6374.1 $*
May-19-2025 6199.98 $* 6323.99 $*
Apr-19-2025 4949.50 $* 5048.89 $*
Mar-19-2025 6099.82 $* 6221.79 $*
Feb-19-2025 6049.51 $* 6170.5 $*
Jan-19-2025 5999.27 $* 6119.19 $*

Характеристики





Product Description


Hydraulic Auto-Climbing Formwork
The best choice for high rise buildings and bridges




The power of hydraulic climbing formwork comes from the hydraulic jacking system which contains a hydraulic oil cylinder and a vertical reversing box which can control the lifting rail or the lifting rack. The hydraulic system can generate inter-climbing between the formwork rack and the rail ,so that the hydraulic climbing formwork can climb up stably.
During construction, the hydraulic climbing formwork doesn't need other lifting devices, and has advantages of easy operation ,quick climbing and high safety coefficient. It is the first choice for high-rise building construction.










Charateristics


Hydraulic auto-climbing formwork can climb as acompletely or individually. The climbing process is steady, synchronous and safe.
The brackets of the auto-climbing formwork system will not be dismantled until the construction period finished, thus saving space for the site and avoiding damage to the formwork, especially to the panel.
It provides all-round operating platforms. The contractors do not need to set up other operating platforms, thus saving the cost on material and labor, and improving safety.
The error of structure construction is small. As work on correction is simple, the construction error can be eliminated floor by floor.
The climbing speed of the formwork system is fast. It can speed up the whole construction work (average 5 days for one floor).
The formwork can climb by itself and cleaning work can be done in situ, so that the use of tower crane will be greatly reduced.


Products Show








Packing & Delivery


Packaging:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
2. Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Bulk: Some irregular goods will be loaded in bulk in container.
Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.


Our Services


1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.

2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.

3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.

4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.


Our Company


Lianggong Formwork Co., Ltd
Lianggong Formwork Co.,Ltd. is one of the leading formwork and scaffolding companies headquartered in Nanjing City, China, with its factories located in Jianhu Economic Development Zone of Yancheng City, Jiangsu Province. As a well-established company in construction formwork field, Lianggong has been devoted itself and specialized in formwork and scaffolding research, development,manufacturing, and labor service.

During the years of hardworking since 2010 by the whole company staff, Lianggong has successfully delivered and served a large number of projects at home and abroad, such as bridges, tunnels, power stations, and industrial & civil constructions. Major products of Lianggong include H20 timber beam, wall and column formwork, single-sided bracket, crane-lifted climbing formwork, hydraulic auto-climbing system, protection screen and unloading platform, shaft beam, table formwork, ring-lock scaffolding and stair tower, cantilever forming traveller and hydraulic tunnel lining trolley, etc.

Utilizing its strong technical background and abundant engineering experience, and always bearing in mind to keep its
cost-effectiveness and efficiency for clients, Lianggong will continue to be your best partner in any project from the very start and achieve higher and further goals together.








Customer Photos






FAQ


Q: Are you trading company or manufacturer ?
A:We are factory.

Q:How long is your delivery time?
A:Generally it is 5-15 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to
quantity.

Q:Do you provide samples? is it free or extra?
A:Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q:What is your terms of payment ?
A:Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance,balance before shippment.


Похожие товары

Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com