Профессиональное производство дешевый Популярный продукт новый вид пивоваренного оборудования из нержавеющей стали


Поделиться:


Цена:5 700,00 $*

Количество:



Описание и отзывы


Трекер стоимости

Месяц Минимальная цена Макс. стоимость
Sep-19-2025 6783.43 $* 7122.65 $*
Aug-19-2025 6726.16 $* 7062.36 $*
Jul-19-2025 5643.59 $* 5925.32 $*
Jun-19-2025 6612.13 $* 6943.51 $*
May-19-2025 5757.61 $* 6045.63 $*
Apr-19-2025 6498.86 $* 6823.31 $*
Mar-19-2025 6441.64 $* 6763.8 $*
Feb-19-2025 6384.25 $* 6703.60 $*
Jan-19-2025 6327.10 $* 6643.82 $*

Характеристики



Product Parameters


Brand Name
CARRY
Product Type
100L Brewing System
Voltage
220-415V, 380V/3PH/50Hz or according
Size
1750*770*1660mm
Material
SUS304 Strainless Steel
Tank thickness
3mm for Inner-Jacket/2mm for External-Jacket
Heating method
Electric element, or Steam heating direct fire heating
Certification
CE ISO
Insulation layer
PU 80mm
Payment
Trade Assurance, PayPal, Western Union, T/T, L/C and so on




Company Information






Shandong CARRY Equipment Co.,Ltd, located in Jinan city, Shandong province, is a professional beer brewery equipment manufacturer and exporter.
We are specialized in the professional design, manufacture, installation and commissioning of beer brewery equipment and supporting facilities. We provide solutions for all kinds of craft beer brewery, including pilot, nano, micro,commercial brewhouse, pub/restaurant brewery, mashing system, fermenting system, glycol system, cleaning system, control system, beer filling system, beer selling system and relative accessories & auxiliaries as well.


Production Process




Customer Show






Certifications




Why Choose Us


1.Provide Layout
Give us your building's preliminary sketch/rough draft, or the building's size( Length, Width, and Height).
And Our Engineer will design a floor plan for you.

2.Provide Equipment Design Drawing
According to our equipment design dimension and the floor plan,
Our Engineer will do a detailed drawing for the customer, and send it to our factory to produce after the customer confirmed it.

3.Provide Installation
1). Our company will send the Engineer to install the brewery equipment in buyer's local.
The service period is about 20 days, Including assemble the brewery and training the operator.
Provide beer production technology and brewing formula, Equipment design, installation and debugging, and personnel training service.
2). Online guided installation is provided too if the engineer can't go there for field installation.





Packaging & Shipping


Inner stretching membrane and PE paper and outer steel frame, and other packaging for shipping.
1. Main beer brewing tanks, fermenting vessels and turnkey brewhouse system will be packaged with plastic film firstly, then with reinforced steel frames.
2. All beer brewing spare parts, accessories and fittings will be packaged with carton box and crated.
3. All items wrapped with soft package for protection.
4. Each parts of whole brewing system will be labeled.




FAQ


1.Q: Are you a manufacturer?
A: Yes, we have been in providing the professional products in this field for more than 10 years.

2.Q: Can your factory produce equipment according to our drawing or samples?
A: Yes, we can do.

3.Q: Is possible to supply installation in our country ?  
A: Yes, we could supply engineer to supply installation guidance and training.

4.Q:What's the  service you can provide?
A:Provide beer production technology and brewing formula,beer brewing equipment design, installation and debugging, personnel training service;Providing CAD and 3D layout drawing.

5.Q: How you pack the products ?
A: Normally as the export standard packaging or as you required.
 
6.Q: What is your available port of shipment?
A: Qingdao port, Tianjin Port, or others.

7.Q:What's the  beer brewing equipment warranty time?
A:Provide 3 years complete warranty for beer brewing tanks body and life-time maintenance service; All of the accessories and auxiliaries facilities are guaranteed for one year.

8.Q:How to check the quality before delivery?
   A: We have our professional engineers to check the beer brewing equipment quality before delivery, also we welcome you come to check the quality or let the third-party check the beer brewing equipment quality before the equipment delivery.

9. How long is your delivery time?
Usually the delivery time is 35 working days after we received your deposit, and if you are very urgent, we will arrange first-production.


Похожие товары

Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com