Поделиться:
Месяц | Минимальная цена | Макс. стоимость |
---|---|---|
Sep-15-2025 | 0.69 $* | 0.62 $* |
Aug-15-2025 | 0.2 $* | 0.20 $* |
Jul-15-2025 | 0.75 $* | 0.1 $* |
Jun-15-2025 | 0.90 $* | 0.42 $* |
May-15-2025 | 0.81 $* | 0.3 $* |
Apr-15-2025 | 0.34 $* | 0.21 $* |
Mar-15-2025 | 0.80 $* | 0.72 $* |
Feb-15-2025 | 0.50 $* | 0.39 $* |
Jan-15-2025 | 0.43 $* | 0.75 $* |
Packing | Metal case |
Logo | Stamping,Lasering,Etching,etc |
Material | 304 Stainless Steel |
Color | Silver, Red, Blue, Rose gold, Black, Gold |
Sample lead time | Within 7 days |
Product Feature | 1.Rust-resistant 2.Easy cleaning and washing 3.Fashional and modern design 4.Suitable for home, bar and restaurant |
Jieyang Rongcheng Zhonghexing Stainless Steel Products Factory is located in Meiyun Hecuo Industrial Zone,Jieyang City,Guangdong Province,with beautiful environment and convenient transportation.
Q: ARE YOU FACTORY OR TRADER?
A: ZhongHeXing Stainless Steel Products Factory is a manufacturer located in Jieyang.
Q: HOW TO GET A SAMPLE?
A: For existing samples, it takes 1-2 days. They are free if freight collected.
For your own designs, it takes 3-14 days, subject to your designs whether they need new printing screen, etc.
Q: DO YOU ACCEPT OEM?
A: We accept OEM & ODM, and we accept low MOQ.
Q: WHAT FORMAT OF THE FILE DO I HAVE TO OFFER IF I WANT MY OWN DESIGN?
A: We have our own designer. So you can provide JPG, AI or PDF, etc. We will draw artwork for mold or printing screen for your final confirmation based on technique.
Q: HOW LONG IS THE PRODUCTION LEAD TIME?
A:It takes 10-15 days for MOQ. We have large production capacity, which can ensure fast delivery time even for large quantity.
Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com