Холодильная камера для рыб холодильник


Поделиться:


Цена:*

Количество:



Описание и отзывы


Трекер стоимости

Месяц Минимальная цена Макс. стоимость
Sep-17-2025 0.66 $* 0.69 $*
Aug-17-2025 0.55 $* 0.84 $*
Jul-17-2025 0.37 $* 0.17 $*
Jun-17-2025 0.44 $* 0.27 $*
May-17-2025 0.20 $* 0.42 $*
Apr-17-2025 0.18 $* 0.86 $*
Mar-17-2025 0.45 $* 0.48 $*
Feb-17-2025 0.78 $* 0.47 $*
Jan-17-2025 0.16 $* 0.51 $*

Характеристики


Products Show

refrigerator freezer

refrigerator freezer

FAQ

OEM Service are available. All our products are customized.
Pls tell us the following specifications before inquiry, then we can give you the exact rates.
1. L*W*H.
2. What kind of products are storaged.
3. Setting temperature.
4. Using what kinds of refrigerant gas.


\t\t\t\t \t\t\t\t \t\t\t\t
Raw Materials

refrigerator freezerrefrigerator freezer

 

Product nameColour Steel Sandwich Panels
ApplicationInsulation of exterior wall, roof and curtain wall insulation
Surface materialColour Steel
Core materialeps/pu/rock wool
Thickness50mm 75mm 100mm 150mm 200mm


\t\t\t\t
Our Certifications
refrigerator freezer
Customer Photo
refrigerator freezer
Transaction Records

refrigerator freezer

Customer evaluation

refrigerator freezer


Factory Live

 refrigerator freezer 

refrigerator freezer

\t\t\t\t
Packaging and Shipping

refrigerator freezer

Fixed packing, loading, transportation, unloading the matters needing attention:

(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the

rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.

(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile

up securely, and to increase the necessary binding component loosening, prevent the loss.

(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.

(4) No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.

(5) The member to the construction site, timely organization of unloading, stacking area.

(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.


\t\t\t\t

Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com