Поделиться:
Месяц | Минимальная цена | Макс. стоимость |
---|---|---|
Sep-20-2025 | 2.51 $* | 2.85 $* |
Aug-20-2025 | 2.72 $* | 2.1 $* |
Jul-20-2025 | 2.10 $* | 2.30 $* |
Jun-20-2025 | 2.96 $* | 2.99 $* |
May-20-2025 | 2.51 $* | 2.77 $* |
Apr-20-2025 | 2.73 $* | 2.21 $* |
Mar-20-2025 | 2.1 $* | 2.17 $* |
Feb-20-2025 | 2.2 $* | 2.3 $* |
Jan-20-2025 | 2.46 $* | 2.15 $* |
Type | WH-A23 |
Capacity | Max: 50 kg Accuracy: 10 g |
Unit | kg; lb; oz; jin |
Materials | ABS plastic; High Carbon Steel; |
Display | LCD |
Power | 2 AAA batteries |
Color | Black |
Certificate | FCC; CE; ROHS |
Warranty | 12 months |
Auto off | 120 seconds without any operation | |
Tare | If you are using container, you should first hang the container on the hook, press the ON/TARE button to reset 0 g, and then place the goods in the container. You can get the net weight of the goods. | |
Lock | If the goods are stable, the data is locked and HOLD is displayed on the LCD; You can press Tare button for 3 seconds to turn on or turn off lock function; "L_OF" meaning lock function off; "L_ON" meaning lock function on. | |
Temperature | press Unit button for 3 seconds, it'll display temperature | |
Low battery and over load indication; Reset zero |
PCS/Carton | Carton size/ CM. | G.W./ KG. | Packing box size / CM. |
100 | 38.5*30*47.5 | 19.5 | 14*9*3.3 |
Container Size | MOQ / PCS |
20 GP | 47600 |
OEM Services | MOQ/PCS. | Marks |
Printing LOGO | 500 | The Unit price will be very very high if your MOQ less than 500 pcs or 1000 pcs. Most of supplier refuse to accept the QTY less than 500 pcs or 1000 pcs. Because every time the machine is turned on, it will wear down the machine. |
New manual | 500 | |
New packing box | 1000 | |
Change the color | 1000 | |
Change the system | 1000 | |
Change the hook or others | 1000 |
OEM products | Delivery time | Marks |
Samples of printing logo | 3-5 days | Mass goods production need 3-5 days |
Samples of manual | 3-5 days | |
Samples of packing box | 4-10 days | |
Samples of changing the color | 4-10 days | |
Samples of changing the system | 4-10 days | |
Samples of changing hook or others | 4-10 days |
ODM products | Delivery time | Marks |
Samples | 30-60 days | Mass goods production need 3-5 days |
Standard products | Delivery time | Marks |
Samples | 1-2 days | Mass goods production need 1-3 days |
Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com