Поделиться:
Месяц | Минимальная цена | Макс. стоимость |
---|---|---|
Sep-15-2025 | 0.52 $* | 0.60 $* |
Aug-15-2025 | 0.52 $* | 0.54 $* |
Jul-15-2025 | 0.18 $* | 0.80 $* |
Jun-15-2025 | 0.21 $* | 0.33 $* |
May-15-2025 | 0.28 $* | 0.4 $* |
Apr-15-2025 | 0.62 $* | 0.40 $* |
Mar-15-2025 | 0.35 $* | 0.39 $* |
Feb-15-2025 | 0.63 $* | 0.58 $* |
Jan-15-2025 | 0.43 $* | 0.32 $* |
Wet method sodium silicate process is a new way in chemical formula sodium silicate production. Especially for low molar ratio sodium silicate from 2.0 to 2.5 used for adhensive or soap , Compared with the dry process production, the wet process production of chemical formula sodium silicate will be simple, easy to operate, and with low energy consumption, less investment, and high product quality, low cost, which can greatly reduce the cost by 50-80 dollar per ton liquid sodium silicate. If the dry method is two-step method, the wet method can be seen as one-step method. And at present, many companies in China have chosen this method for the sodium silicate production, which has been famous among the customers.
Item | Dry method | Wet method |
Process | Two step method | One step metod |
Chemical formula | Silica sand and soda ash or sodium sulfate | Silica sand and caustic soda |
Main equipment | Furnace and dissolving plant | Reaction equipment( as easy as the dissolver process) |
complexity | With furnace, hard to control | With equipment only, easy |
Investment | High | Half of dry method |
Molar ratio | All molar ratio from 2-3.5 or higher | Lower than 2.6 |
Operator | Furnace operator and dissolver operator, 5-8 people per shift or more | 2-3 people per shift |
Maintenance | The maintenance of furnace cost will be 1/3 of the furnace investment, time is long, and hard work | Easy for maintenance of equipment, and also can easy to move |
Product | High quality | High quality |
Q1. What kind of chemical formula sodium silicate can be produced by this equipment?
A: This one is specially for liquid sodium silicate from molar ratio under 2.5, baume degree under 45.
Q2. What about the delivery time?
A: It will be 60-70 days after the down payment
Q3. How about the electricity problems?
A: You can tell us your country electricity requirement, will do use the motor as required.
Q4. How do you ship the goods?
A: We usually ship by 20'GP and 40'GP, however, we would like to use some open top container, because it will be easier and more safe to load and unload.
Q5. How to proceed an order for equipment?
A: Firstly let us know your requirements or application.
Secondly We quote according to your requirements or our suggestions.
Thirdly customer confirms it and places deposit for formal order.
Fourthly We arrange the production.
Q6. How do you test your equipment before shipment?
A: We will do pressure test before shipment for the equipment
Q7: Do you offer guarantee for the products?
A: Yes, we offer 1 years warranty to our products.
Q8: Can I have my special requirement?
Usually all these equipment are customized, to be based on the premise of scientific design and easy for shipment, the material, the concrete size of the equipment can be as customer requirement.
Q9: How about the installment?
our engineer can work overseas for installment instruction. And Turkey project can be realized by us
Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com