Поделиться:
Месяц | Минимальная цена | Макс. стоимость |
---|---|---|
Sep-19-2025 | 0.48 $* | 0.33 $* |
Aug-19-2025 | 0.47 $* | 0.93 $* |
Jul-19-2025 | 0.37 $* | 0.38 $* |
Jun-19-2025 | 0.7 $* | 0.61 $* |
May-19-2025 | 0.64 $* | 0.51 $* |
Apr-19-2025 | 0.27 $* | 0.29 $* |
Mar-19-2025 | 0.37 $* | 0.2 $* |
Feb-19-2025 | 0.38 $* | 0.82 $* |
Jan-19-2025 | 0.32 $* | 0.22 $* |
q195 galvanized steel strip
· We are the professional manufacturer of galvanized steel strip / coil and pre-galvanized steel tube. We have been in this line for more than 38 years.
· Based on experience,with our reasonable price ,high quality and considerate service.Our products enjoy the high reputation in Chinese market,which are sold more than 30 provinces and regions of China.
· Meanwhile,the products are welcomed by Europe,Southeast Aisa,South America and Africa regions. It has already
entered Australia,Canada,Chile,Singapore,Japan,Korea,Phillippines,Thailand,Myanmar,India,Bangladesh,Sri Lanka etc.
Production Description:
· Our factory established in 1979,which is located in Tianyu Science and Technology Park,Jinghai County,Tianjin City,China.
· Our company has 5 years' experience in manufacturing hot dipped galvanized steel strip / coil and pre galvanized steel tube.
· Workers and a team of engineers,advanced production lines and a factory with more than 200000 square meters, our output capacity reaches 2000 tons everyday.
· Our factory owns 5 pickling production lines,could descale of HR strip/coil 2000 tons/day.
· Our factory owns 6 cold rolling production lines,could produce CR strip/coil 2000 tons/day.
· Our factory owns 6 continuous annealing lines,realize temperature from 0-800 degree heating,warming and cooling.Achieving Fe and Zn reacting fully and accurately controlling physical and chemical properties.
· Our factory owns 6 galvanizing production lines,could produce GI strip 2000 tons/day.Chromate treatment.
· Our factory owns 14 tube production lines,could produce GI tube 2000 tons/day.
· Before the order to be confirmed,we would check the material by sample,which should be strictly the same as mass production.
· We will trace the different phase of production from the beginning
· Every product quality checked before packing
· Clients could send one QC or point the third party to check the quality before delivery.We will try our best to help clients when problem occurred.
· Shipment and products quality tracking include lifetime.
· Any small problem happening in our products will be solved at the most prompt time.
· We always offer relative technical support, quick response, all your inquiries will be replied within 24 hours.
Cherry Chen
Phone(wechat/whatsapp/skype): 86-18539282682
Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com