2019 новый стиль электро-гидравлический гибочный пресс удар и сдвига машины Q35Y-23 по сбору металлоконструкций для 2 лет


Поделиться:


Цена:6 000,00 $ - 6 500,00 $*

Количество:



Описание и отзывы


Трекер стоимости

Месяц Минимальная цена Макс. стоимость
Sep-17-2025 7140.23 $* 7497.3 $*
Aug-17-2025 7080.72 $* 7434.58 $*
Jul-17-2025 5940.19 $* 6237.53 $*
Jun-17-2025 6960.97 $* 7308.32 $*
May-17-2025 6060.36 $* 6363.32 $*
Apr-17-2025 6840.45 $* 7182.28 $*
Mar-17-2025 6780.92 $* 7119.8 $*
Feb-17-2025 6720.40 $* 7056.28 $*
Jan-17-2025 6660.44 $* 6993.37 $*

Характеристики


2019 new stype hydraulic ironworker punch and shear machine Q35Y-23 iron worker for 2 years warranty

hydraulic ironworker1

 

Products Description

The hydraulic iron worker also named combined punching and shearing machine, it is a kind of machine tool that combines various functions such as metal shearing, punching, shearing and bending. It has the advantages of simple operation, low energy consumption and low maintenance cost. It is a modern manufacturing industry (such as: Metallurgy, bridge, communications, electric power, military and other industries) metal processing equipment. The combined punching and shearing machine is divided into two types: hydraulic combined punching and shearing machine and mechanical combined punching and shearing machine.
The fuselage of the combined punching and shearing machine adopts a steel casting structure with strong stability. The cutting molds are made of high-quality steel and low-carbon steel, which is strengthened by the quenching coating process. Oil tubing and electrical installations are supplied by Taiwanese and European manufacturers and have a long service life.

 

hydraulic ironworker3hydraulic ironworker2

The combined punching machine is widely used in

1. Steel structure processing;
2. Elevator car and parts processing;
3. Trailer--- spare tire parts, hinges of trailers, hooks, inserts, and walls;
4. Construction machinery industry---belt machine, processing on the mixing station;
5. Agriculture and animal husbandry machinery industry---granulation rack body, trailer body parts processing;
6. Food industry machinery - slaughtering equipment frame and parts processing;
7. Processing of high and low voltage tower parts;
8. Wind power equipment---stairs on the wind power tower and parts processing on the pedal;
9. Machining---Construction of building embedded parts/conveyor brackets and other components;
10. Grain Machinery---Grain and Oil Equipment Starch Equipment Bracket, Shell, Small Parts Processing;
11. Railway freight car / car, crane parts processing;
12. Cutting, punching and bending of steel such as channel steel, square steel, round steel, H steel and I-beam.

 

Operate Steps

1. Check the power supply condition, the voltage is stable, there is no phase loss, and the leakage protector and air switch are intact;
2. Wiring, open the joint punching machine wiring cabinet, connect the line, close the door;
3. Press the foot switch after power-on, the machine does not move, the power cord is swapped, and the emergency stop switch is turned on;
4. Pin pedal switch linked;
5. At work, pay attention to turning off the power every time you change the mold at work;
6. After the work is finished, turn off the switch, turn off the main power switch, remove the power cord, and clean the debris.

 

iron worker 02

 

iron worker 03

 

iron worker 04

 

iron worker 06

 

Hydraulic iron worker details description

Punching Station

The complete universal punches and dies are available;
Better replacement coupling nut and sleeve for rapid replacement of change;
Can punch various diameter hole for plate;
With 2 pieces of gauging table with rulers;
With swing away design for stripper.

 

Shearing Station

Can complete 45° or 90° shearing for angle steel.
Also suit different size square bar and various diameter round bar shearing;
The product to be processed can be fixed by manually tightening the screw.

 

Notching Station

Unique design gauging stops for precise positioning for cutting to angle. Electrical interlock safety guard .The notching section of preda hydraulic combined punching and shearing machine is perfect for notching flat bar /angle steel/pipes and so on.

iron worker 07iron worker 08iron worker 09

 

Anhui Preda Machinery Manufacturing Co., Ltd. is a manufacturing plant, and produces and sells machinery, machine tools, machine tools, machine tools and machinery parts. It has many years of production experience and export experience. The products are sold to Europe, Middle East, Asia, etc. Countries in each region are unanimously recognized by customers.

Our company's equipment includes ventilation equipment, hydraulic shearing machines, bending machines, punching and shearing machines and other equipment for industrial production. A wide range of products to meet the different needs of customers also supports the customization of personalized machines according to customer requirements.

hydraulic ironworker4

FAQ
1. How to get a accurate quotation from Preda Machine?
Provide the machine name you want, the specifications you need and the quantity of machine, we shall quote accordingly!
2. What's the shipping cost from China to your country?
Please kindly tell us your nearest port to your place. We have reliable shipping forwarder to insure cheap, safe, convenient and timely delivery via sea.
3. Payment terms, MOQ, warranty, FOB.

Payment terms: 20% TT paid in advance, the balance of 80% before the shipment.
Minimum order quantity: 1 set of any machine of Preda Machine.
Delivery time : Standard-sized machines will be packaged in stock, we will contact the appropriate schedule, about 10-20 days; custom will take 1 month.
Shipping terms: FOB, CFR, CIF and etc.. according to your requirements.
Warranty:24 months after our machines arriving at you.

4. What's the package?
20'' container, 40'' container, wooden case, wooden tray....
5. What about commissioning service?
We can offer commissioning service, the buyer need to pay for all the transport, salary, hotel, meals for Preda Machine technicians caused during the service period.
6. What's policy for guarantee and broken parts?
Warranty period of equipment is two years, during which the broken parts and spares caused by quality can be offered free. After guarantee period, all broken parts or easy wearing parts will be charged in a most competitive price ever in the market!

 

Welcome to contact us!!


Похожие товары

Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com