Поделиться:
Месяц | Минимальная цена | Макс. стоимость |
---|---|---|
Sep-15-2025 | 0.86 $* | 0.95 $* |
Aug-15-2025 | 0.53 $* | 0.81 $* |
Jul-15-2025 | 0.47 $* | 0.64 $* |
Jun-15-2025 | 0.53 $* | 0.61 $* |
May-15-2025 | 0.23 $* | 0.32 $* |
Apr-15-2025 | 0.53 $* | 0.69 $* |
Mar-15-2025 | 0.14 $* | 0.84 $* |
Feb-15-2025 | 0.91 $* | 0.96 $* |
Jan-15-2025 | 0.44 $* | 0.25 $* |
Model No | BF-YTD | BF-YTD | BF-YTD | BF-YTD | |||
Power | 50W | 100W | 150W | 200W | |||
Luminous Flux | 6700LM | 13500LM | 20000LM | 27000LM | |||
Dimension | L203×W291×H62mm | L277×W291×H62mm | L353×W291×H62mm | L428×W291×H62mm | |||
Voltage | 100-277V 50/60Hz | 100-277V 50/60Hz | 100-277V 50/60Hz | 100-277V 50/60Hz | |||
LED Driver | Gao Gong HT-HLB-50 | Gao Gong HT-HLB-100 | Gao Gong HT-HLB-150 | Gao Gong HT-HLB-200 | |||
LED Chip | Lumileds/CREE | Lumileds/CREE | Lumileds/CREE | Lumileds/CREE | |||
LED light source | 3030(56pcs) | 3030(112pcs) | 3030(168pcs) | 3030(224pcs) | |||
Luminous Flux | 130-140lm/w | 130-140lm/w | 130-140lm/w | 130-140lm/w | |||
(Ra>) | 70/80 | 70/80 | 70/80 | 70/80 | |||
Power factor | PF>0.98 | PF>0.98 | PF>0.98 | PF>0.98 | |||
IP Rating | IP65 | IP65 | IP65 | IP65 | |||
Working Temp | -40°C~ 55°C | -40°C~ 55°C | -40°C~ 55°C | -40°C~ 55°C | |||
Color temperature | 3000k,4000K,5000K,5500K,5700K,6500k | ||||||
Beam angle | 90/120/70*150 Degree | ||||||
certificate | CE Rosh | ||||||
Warranty | 5yers | 5yers | 5yers | 5yers | |||
Material | die-casting aluminum; plastic |
1.Q:Are you manufacturer or trade company?
A:We are the Manufacturer, specialized in producing Led highbay, led linear light, led down light, led stage light, etc..
2.Q:How can I get the samples?
A:We appreciated that you can accept to pay the sample cost and sample freight.
3.Q:How much the transportation freight of samples?
A:The freight depends on the weight and packing size, as well as your area.
4.Q: When's the delivery time for the sample?
A:The samples will be ready for 2-5 days.
5.Q:Do you offer OEM&ODM service?
A:Yes, we do.
6. Q: How do your factory control quality?
A: Quality is the most important part for us. In order to control quality better, We have professional QC. All our products pass 4 times inspection by QC before delivery. The first time for raw material, second for finished products, third for products appearance and fourth for function.)
7.Q: How to pay the money?
A: We could accept the payment by L/C or T/T or Western Union or Paypal. Please tell us the payment that you prefer, we will send the detail information to you.
8. Q: What’s the shipment method?
A: It could be Ocean Shipping, Airlift and Express (EMS, UPS, DHL, TNT, FEDEX, ect). So before placing order. Please contact us to confirm your preferred shipment method.
9. Q: When's the delivery time for the order?
A: 30 days after the receipt of deposit.
10.Q:Could you please make it clear to me about your trade information?
A: Sure. Please find below details:
Payment terms: L/C, T/T, Western Union.
Payment condition: 30% deposit in advance, 70% balance before delivery or against the copy of Bill of Loading.
Delivery time: 30-45 days after the receipt of deposit.
Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com