Трехфазный индукционный двигатель LANDTOP 10 hp 20 30 380v по заводской


Поделиться:


Цена:135,00 $ - 150,00 $*

Количество:



Описание и отзывы


Трекер стоимости

Месяц Минимальная цена Макс. стоимость
Aug-17-2025 171.86 $* 174.24 $*
Jul-17-2025 139.46 $* 142.20 $*
Jun-17-2025 169.96 $* 172.74 $*
May-17-2025 167.50 $* 170.4 $*
Apr-17-2025 134.74 $* 137.41 $*
Mar-17-2025 165.57 $* 168.0 $*
Feb-17-2025 163.81 $* 166.3 $*
Jan-17-2025 162.31 $* 165.86 $*

Характеристики



Product Description


LANDTOP Electric Motors power range cover 1HP-500HP, the installation size and power level of the Y2 series motors conform to the IEC standard, and they are the same as the Y series motors. The enclosure protection level is IP54, the cooling method is IC41l, and the continuous working system (S1).


Model
Y2-132S2-2
Power
7.5KW/10HP
Rated Voltage
380/660V
Rated Current
14.2A
Speed
2900r/min
Phase
Three Phase,Four Wire




  • Description of application effect

LANDTOP electric motors can be use in wide range,like machinery,industrial and so on.
LANDTOP series motors have the advantages of compact structure,large power margin,stable operation,perfect speed regulation,low discharge and high realibity,etc.


Detailed Images


Three Phase electric motors detail images like this:




Products Data


Model
Rated power
Rated voltage
Rated current
Speed
Efficency
Power Factor
Locked-rotor Current
Locked-rotor Torque
(KW)
(HP)
(V)
(A)
(r/min)
(η%)
Rated Current
Rated Torque
Y2-7112
0.37
0.5
220/380
0.98
2740
70
0.81
6.1
2.2
Y2-7122
0.55
0.75
220/380
1.33
2740
73
0.82
6.1
2.2
Y2-80M1-2
0.75
1
220/380
1.8
2830
73
0.84
7
2.2
Y2-80M2-2
1.1
1.5
220/380
2.5
2830
76
0.86
7
2.2
Y2-90S-2
1.5
2
220/380
3.4
2840
79
0.87
7
2.2
Y2-90L-2
2.2
3
220/380
4.7
2840
82
0.88
7
2.2
Y2-100L-2
3
4
220/380
6.4
2870
82
0.88
7
2.2
Y2-112M-2
4
5.5
380/660
8.2
2890
85
0.89
7
2.2
Y2-132S1-2
5.5
7.5
380/660
10.7
2900
86
0.89
7.5
2.2
Y2-132S2-2
7.5
10
380/660
14.2
2900
87
0.9
7.5
2.2
Y2-160M1-2
11
15
380/660
20.9
2930
88
0.9
7.5
2.2
Y2-160M2-2
15
20
380/660
27.9
2930
89
0.9
7.5
2.2
Y2-160L-2
18.5
25
380/660
33.9
2930
90
0.9
7.5
2.2
Y2-180M-2
22
30
380/660
40.5
2940
90
0.9
7.5
2
Y2-200L1-2
30
40
380/660
54.8
2950
91.2
0.9
7.5
2
Y2-200L2-2
37
50
380/660
66.6
2950
92
0.9
7.5
2
Y2-225M-2
45
60
380/660
81
2970
92.3
0.91
7.5
2
Y2-250M-2
55
75
380/660
99.6
2970
92.5
0.91
7.5
2
Y2-280S-2
75
100
380/660
133.3
2970
93
0.91
7.5
2
Y2-280M-2
90
125
380/660
158.2
2970
93.8
0.92
7.5
2
Y2-315S-2
110
150
380/660
195.1
2980
94
0.92
7.1
1.8
Y2-315M-2
132
180
380/660
231.6
2980
94.5
0.92
7.1
1.8
Y2-315L1-2
160
220
380/660
279.6
2980
94.6
0.92
7.1
1.8
Y2-315L2-2
200
270
380/660
347.7
2980
94.8
0.92
7.1
1.8
Y2-355M-2
250
340
380/660
433
2980
95.3
0.92
7.1
1.6
Y2-355L-2
315
430
380/660
544
2980
95.6
0.92
7.1
1.6


Related Products




Packing&Shipping


Packing and shipping all by professional staff.




After Sales Service


Warranty
1.Warranty is according to our standard conditions: 12 months.
2.We take charge of all troubles caused by motor’s fault and repair according to the regulation stipulated by original plants.
3. Factors not accordance with the regulation of original plants such as fragile parts, daily consumed components, wrong operating, lack of maintenance are not including in the quality guarantee.



Company Introduction


Fuzhou LANDTOP company is specialized in manufacturing and exporting a wide range of good & high quality diesel generator,alternator,electric motors etc.we provides the customized products. Our factory is located in Fu'an City, own the proficient skill and updated machine.Our product,owing to reasonable price,high efficiency and energy saving performance,are widely praised by clients in over 80 countries and regions,such as South America,Southeast Asia,the Middle East,Africa,etc.




Our Services 
What we do:
1.Stamping of lamination
2.Rotor die-casting
3.Winding and inserting – both manual and semi-automatically
4.Vacuum varnishing
5.Machining shaft, housing, end shields, etc…
6.Rotor balancing
7.Painting – both wet paint and powder coating
8.assembly
9.Packing
10.Inspecting spare parts every processing
11.100% test after each process and final test before packing.


FAQ


Q: Do you offer OEM service?
A: Yes
Q: What is your payment term?
A: 30% T/T in advance, 70% balance when receiving B/L copy. Or irrevocable L/C.
Q: What is your lead time?
A: About 30 days after receiving deposit or original L/C.
Q: What certifiicates do you have?
A: We have CE, ISO. And we can apply for specific certificate for different country such as SONCAP for Nigeria, COI for Iran, SASO for Saudi Arabia, etc.


Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com