Поделиться:
Месяц | Минимальная цена | Макс. стоимость |
---|---|---|
Sep-17-2025 | 134477.41 $* | 141201.80 $* |
Aug-17-2025 | 133347.9 $* | 140014.26 $* |
Jul-17-2025 | 111876.32 $* | 117470.68 $* |
Jun-17-2025 | 131087.34 $* | 137641.20 $* |
May-17-2025 | 114136.65 $* | 119843.37 $* |
Apr-17-2025 | 128827.23 $* | 135268.37 $* |
Mar-17-2025 | 127697.63 $* | 134082.34 $* |
Feb-17-2025 | 126567.71 $* | 132895.58 $* |
Jan-17-2025 | 125437.27 $* | 131709.36 $* |
Performance:
HZBB-10B-I intelligent tester of Transformer Ratio and Connection Groups adopts popular ARM
processor, 168M frequency, 128M memory available to be extended to 4G memory card. The LCD screen adopts 7-inch high-definition color touch screen, combined with emwin display, making the tester interface simple and user-friendly in full touch screen and non-keyboard operation. The tester supports database and can be exported from the USB drive or through the data cable to the background computer.
Elaborate and compact design, unique thinking, makes the tester superior and powerful with small size and light weight. The tester uses a programmable signal source, can output single-phase, two-phase or three-phase standard Sine signal or high-frequency Sine signal, with adjustable output phase frequency. It is especially suitable for special transformers such as Z-type transformers, rectifier transformers, Scott or anti-Scott transformers, etc. The tester adopts the new algorithm developed by our company to measure the ratio of three-phase transformer and ensure the measurement accuracy without adjusting the balance of the three-phase power supply. Therefore, the transformer ratio and wiring method can be measured in about 3 seconds.
1. The ground terminal or the ground wire in the power cable should be grounded reliably.
2. Please note that the four-color test wires at the high-voltage side in yellow, green, red and black correspond respectively to the transformer A, B, C, N terminals. The three-color test wires at the low-voltage side in yellow, green and red correspond respectively to the transformer a, b, c, n terminals. Be sure to make correct connections.
3. When testing the Scott transformer, the high voltage side is the same as the above, low-voltage side a, β, n correspond to a, b, c terminal.
For single-phase transformer, high-voltage side A, X correspond to A, C terminals, low-voltage side a, x corresponds to a, c terminals.
4. For general Y / y, Y / d, D / d, D / y, ZN / y, ZN / d normal connection group measurements, connection to the neutral point N terminal is not needed. For single-phase transformer measurements, please use the yellow, green test clips at high-voltage side and the yellow, green test clips at low-voltage side.
5. Please enter correct setting parameters before test. The group label and the measured transformer must be consistent. If not sure, choose unknown to be measured by the tester automatically.
6. If you the rated ratio is not put in, results only show the measured ratio value, and do not show the error.
7. To make self-test, please use the built-in output and externally connect standard instrument. Make comparisons between the first and second voltage measurements to check its accuracy.( The accuracy cannot be confirmed in measuring range as the nonlinearity of the Potential Transformer.)
Ratio measurement range: 0.8-5000(0.8-20000 for Customization) |
1. 2. Ratio measurement accuracy: 0.2%(0.8-1000),0.5%(1000-5000),0.1%(0.8-2000),0.2%(2000-20000)( customized) |
Input voltage: HV side output AC 24V |
Working power: AC220V ± 15% |
Operating temperature: -10 ℃ -40 ℃ |
Environmental humidity: 10% -85% |
Volume: 270 × 190 × 70mm |
Weight: 2kg (not including test wires) |
FAQ:
1. How can I choose the suitable one?
Dear customer, please tell us your detailed requirements by mail or online, we will recommend the suitable one as your request.
2. Does your price is competitive?
Dear customer, we have our own factory,we make sure to offer you the best quality with competitive price.
3. How can I pay?
Dear customer, we accept many payment term, such as T/T, Western Union…
4. When I receive it after pay?
Dear customer, normal models can be delivered with 5-7days, please contact us to check transport time to your address.
5. How to deliver?
Dear customer, we can send by Express, by Sea and by Air.
6.Is will be broken during transport?
Dear customer, please do not worry, we do standard export package.
7.What should I do if I do not know how to use?
Dear customer, please do not worry, manual user will be sent together, you can also contact us with more technological support.
8.What should I do if some parts broken?
Dear customer, please do not worry, we have 12months warranty except wear parts. You can also buy parts from us after 12months.
Huazheng Electric Manufacturing (Baoding) Co.,Ltd Established in March 2008. We are located in Baoding near Beijing and have convenient transportation access.
Huazheng Electric is a professional manufacturer engaged in the research, development, production, sale and service of electric power systems. our products are extensively used in power systems, railway systems, large-scale petrochemical plants and enterprises have a lot of electrical equipment. In addition, we have attained CE ISO9001 certificates.
Our products are widely recognized and trusted by users and can meet continuously changing economic and social needs. To learn more about what we can do for you, contact us at any time. We look forward to establishing a good and long-term business relationship with you.
Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com