Поделиться:
Месяц | Минимальная цена | Макс. стоимость |
---|---|---|
Sep-19-2025 | 3927.19 $* | 4123.38 $* |
Aug-19-2025 | 3894.80 $* | 4089.87 $* |
Jul-19-2025 | 3267.19 $* | 3430.19 $* |
Jun-19-2025 | 3828.43 $* | 4019.84 $* |
May-19-2025 | 3333.32 $* | 3500.78 $* |
Apr-19-2025 | 3762.81 $* | 3950.99 $* |
Mar-19-2025 | 3729.4 $* | 3915.66 $* |
Feb-19-2025 | 3696.4 $* | 3881.40 $* |
Jan-19-2025 | 3663.63 $* | 3846.40 $* |
Type Item | YZJ-4/800 |
Number of spindle | 4 |
Lay-flat width (mm) | 350-750 |
Max.Warp (pcs) | 768 |
Rotational speed of main body (r/min) | 140-180 |
Power of main motor (kw) | 2.2 |
Total Power (kw) | 3.5 |
Production (m/min) (10-24warps/100mm) | 1.4-1.8 |
Installing dimensions | 8400X2200X2650 |
weight (Kg) | 1500 |
Q1:Are Your manufacturer or trading company?
A1:We are manufacture,also poseess ISO 9001 and paten certificates,products covering PE film /PP woven bag production line,bag making machine,siltting machine etc.
Q2: How long is your delivery time?
A2: Generally it is 7 days if the goods are in stock. or it is 10-15 days if the goods are not in stock, it is according to quantity.
Q3:How could we do if the parts broken within warranty?
A3:We would express the free replacement parts during the warranty date.
Q4: Does oversea service available?
A4: YES,it does.We have a experience service team,every member has gone aboard for several times,with rich experience in installing the machine.
Q5.:How do we solve the machine problem after your engineer leaving?
A5:In case you have any problem.You can contact our sales at any time. Our engineer will take a solution video according to your description.
Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com