HJW-30/60 электрическая горизонтальная лабораторная Бетономешалка принудительного


Поделиться:


Цена:*

Количество:



Описание и отзывы


Трекер стоимости

Месяц Минимальная цена Макс. стоимость
Sep-17-2025 0.17 $* 0.49 $*
Aug-17-2025 0.55 $* 0.87 $*
Jul-17-2025 0.54 $* 0.85 $*
Jun-17-2025 0.0 $* 0.13 $*
May-17-2025 0.93 $* 0.36 $*
Apr-17-2025 0.8 $* 0.54 $*
Mar-17-2025 0.12 $* 0.86 $*
Feb-17-2025 0.52 $* 0.66 $*
Jan-17-2025 0.17 $* 0.59 $*

Характеристики


 HJW-30/60 Electric Horizontal Forced Type Laboratory Concrete Mixer

 

Product Description

 

Usage characteristics: HJW-30/60 type forced single horizontal axis concrete mixer is suitable for laboratories of construction research institutes, construction companies and concrete component units. It can mix ordinary concrete and dry hard concrete, and can also be used for mixing different materials in laboratories of other industries. The machine has the advantages of simple operation, high mixing efficiency, small residue and convenient cleaning. It is an ideal laboratory concrete mixing equipment.


II. Main Technical Parameters
Feed capacity: 48 liters/96 liters
Discharge capacity: 30 liters/60 liters
Maximum discharge capacity: 33 liters/66 liters
Stirring uniformity time: <45 seconds
Mixer speed: 35 rpm
Motor power: 1.5 kW
Power supply voltage: 380V OR 220V
Net weight of products: about 200 kg


III. Structure and Working Principle
Structure: The machine is composed of frame, mixing device, transmission system and electrical control system.
The frame is the supporting part of the whole equipment, which is composed of channel steel welding. The stirring device consists of a post stirring cylinder, a stirring shaft and a stirring shovel. The stirring shovel is fixed on the stirring arm and is integrated with the stirring arm to form two groups of spiral band stirring shovels with the same spiral direction, lead and spiral angle. The gap between the stirring shovel and the inner wall of the stirring drum can be adjusted slightly.
The rotating mechanism is composed of a decelerating motor and a coupling. The arrow body limit device is composed of a locking pin and a positioning hole. Electrical control system has the functions of starting, starting, stopping and timing.
Working Principle: The deceleration motor makes the stirring shaft not rotate in a certain direction through the coupling. The material is stirred by the front and back shovels on the stirring shaft. Because of the helical angle, the shovels work to make the material in the cylinder push from one side to the other side and from the other side to the original circular action, so that the material can be fully stirred, thus obtaining a better stirring effect.
When discharging, stop the machine and open the lock button to discharge the mixtures out of the cylinder.


Four, installation
After dismantling the box, check the deceleration motor, barrel, bearing seat and so on. If the rigid parts are loose or not, tighten them to support the flat concrete ground. When the mixer is moved, the rope lock is applied to the bracket. It can not be tied to the mixing shaft. The casters are installed under the base of the mixer and can be moved at will.


V. Operational Procedures
Before starting, check whether there is scratch between the rotating part and the barrel. If there is scratch, it should be adjusted in time.
Clean up the debris in the barrel.
Before starting, the cylinder should be limited to start.
The rotation direction of the stirring shaft shall be indicated by the end face marking of the cylinder.
The materials must be removed from metal and other debris.
Adjust the timing of the mixer according to the mixing time, and pay attention to the need to adjust when the power is cut off.
When the button is pressed, the spindle drives the mixing shovel to run.
Stop automatically after the set time is reached.
When discharging, stop the machine first, open the lock pin, move the handle to rotate the barrel to a fixed position, and then locate the spindle with the lock pin, so that the mixture is discharged out of the barrel.
After discharging the mixing material, the manual cylinder body is reset and the locking pin of the mixing cylinder is positioned.
The cleaning cylinder can pour water into the cylinder to rotate the spindle for washing, or can be cleaned with dry sand.


VI. Maintenance and Maintenance
The bearing parts are lubricated regularly according to the service conditions, and the gearbox lubrication refers to the instructions of other products.
Check the sealing condition of the machine regularly: Check the quality of the sealing gasket in time when the leakage is found.
Check the firmness of the shovel regularly, and tighten it in time if it is loose.
Check the electrical control system regularly for good contact and drying.
After long-term use of the mixer, the shovel and the mixing drum should be worn out, adjusted or replaced according to the wear situation.
Do not insert hands and rods into the cylinder during mixing to avoid danger.
Note: The company can customize mixers of various specifications according to the needs of customers.

 
Product Image
 

5.jpg1.jpg16.jpg7.jpg8.jpg9.jpg12.jpg13.jpg14.jpg15.jpg 

Our Services

 

1. Installation and training:
a. If buyers visit our factory and check the machine, we will teach you how to installand use the machine, and also train your workers/technician face to face.
b.Without visiting, we will send you user manual and video to teach you to install and operate.
c.If buyer needs our technician to go to your local factory, please arrange board and lodging and other necessary things.
d.We will give your professional guidance (Product introduction and operation manual) together with product .

2. After Service:
a.One year guarantee for whole machine.
b.24 hours technical support by email 
c.If there is any problem found of the machine, we will repair it for free in one year.
d.Honesty to working for you, after or before sale with our patient and sincerit

FAQ

 

 

Frequently Asked Question:


Q1.Are you trade company or factory?
A:We are trade company but we also have own factories. Building trade company is just for exporting various types of concrete mould and others products.


Q2. How to visit your company
1. Fly to Beijing airport: By high speed train from Beijing Nan to Cangzhou Xi (1 hour),then we can pick up you.
2. Fly to ShangHai Airport: By high speed train from Shanghai Hongqiao to Cangzhou Xi(4.5 hours), then we can pick you up.

Q3:After an order is placed, when to deliver?
A:Generally about 7-20days, If we have inventory, we can arrange shipment within 3 days.
Please be aware that our production lead times depend on specific items and item quantities.

Q4:What about the warranty with after - sales services?
A:, We can help you repair your equipment freely.,even it's not from our factory. After the warranty, the professional after-sale service team will provide perfect technical support and help guests solve problems encountered while using our product, handles guest problems and complaints in a professional and timely.

Q5:What about the product' services and quality?
A:Each instruments must be carried out 100% quality examination and test when shipping and delivery goods. Product use training, each of our product provide video training to show you how to install & operate. We can arrange engineer to train the operation of equipment to customer's company when you need. Products are widely recognized and trusted by users.

Our Company

 

 Our company can also produce the customized testing machines as clients' requirements.
Best service and the best price for you.


Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com