Забор из колючей проволоки нержавеющей стали для дорожного


Поделиться:


Цена:0,12 $ - 0,20 $*

Количество:



Описание и отзывы


Трекер стоимости

Месяц Минимальная цена Макс. стоимость
Sep-17-2025 0.7 $* 0.38 $*
Aug-17-2025 0.10 $* 0.13 $*
Jul-17-2025 0.8 $* 0.90 $*
Jun-17-2025 0.9 $* 0.73 $*
May-17-2025 0.57 $* 0.3 $*
Apr-17-2025 0.4 $* 0.78 $*
Mar-17-2025 0.56 $* 0.32 $*
Feb-17-2025 0.28 $* 0.75 $*
Jan-17-2025 0.16 $* 0.57 $*

Характеристики


 

Stainless steel Razor barbed wire fence for Traffic

 

PRODUCT PRESENTATION

  Blade barbed wire is also called blade barbed wire, blade barbed wire net, is a new type of protective net.At present, blade stabbing rope has been widely used in many countries' industrial and mining enterprises, garden apartments, border guard posts, military fields, prisons, detention houses, government buildings and other countries' security facilities.
  Installation method of blade thorn rope is divided into :(snake abdomen type) spiral blade thorn rope, linear blade thorn rope, flat blade thorn rope, blade thorn wire welding net, etc., blade thorn rope can be roughly divided into three forms: spiral type, linear type, spiral cross type.

 

Outside Dia.No. of loopsStandard length/coil
450mm337-8m
500mm5612-13m
700mm5613-14m
960mm5614-15m
450mm568-9m(3 clips)
500mm569-10m (3clips)
600mm5610-11M (3 clips)
600mm568-10M (5clips)
700mm568-10M (5 clips)
800mm5611-13M (5 clips)
900mm5612-14M (5 clips)
960mm5613-15M (5 clips)
960mm5614-16M (5 clips)
PRODUCT DISPLAY

16.jpg

 

33.jpg

 

34.jpg

 

51.JPG

 

52.JPG

 

70.jpg

PRODUCT SUPERIORITY

1.jpg

PRODUCT APPLICATION

 .jpg .jpg

WORKSHOP SHOW

.JPG

COMPANY INTRODUCTION

.JPG.JPG

FAQ

 

Q:Are you manufacturer?
A:Yes.We have been in manufacturing this product for 15 years.

 

Q:Where is your factory?
A:No.117 cangzhou road, beiguan industrial park, jiaozhou city, Qingdao city, shandong province.

 

Q:What’s factors in quotation?
A:Wire diameter,mesh aperture,length,width,height,quantity.

 

Q:How many days the samples will be finished?And how about the mass production?
A:Normally,5-7 days for samples,18-20 days for 3-5 containers.

 

Q:Do you have technique support on installation?
A:Yes ,we have professional engineer for installation guide service.

 


Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com