Мебель для спальни Sunshine мягкий закрытый матрас с надувной воздушной кроватью и встроенным


Поделиться:


Цена:32,52 $ - 34,86 $*

Количество:



Описание и отзывы


Трекер стоимости

Месяц Минимальная цена Макс. стоимость
Sep-17-2025 38.70 $* 40.56 $*
Aug-17-2025 38.97 $* 40.34 $*
Jul-17-2025 32.9 $* 34.83 $*
Jun-17-2025 37.8 $* 39.3 $*
May-17-2025 32.28 $* 34.37 $*
Apr-17-2025 36.86 $* 38.69 $*
Mar-17-2025 36.87 $* 38.49 $*
Feb-17-2025 36.50 $* 38.87 $*
Jan-17-2025 36.99 $* 38.17 $*

Характеристики



\t\t\t\t\t\t\t\t\tDescription \t\t\t\t\t\t\t


Item
Inflatable Air Bed
Material
Premium Flocking surface + EN71 PVC
Size
60*80*20 inches
Accessory
Electric Pump, Double use air valve, Repair Kits
Certification
EN71, EN25649, ASTM, REACH, ROHS Standard
 
OEM Service
Customized Logo, Printing, Packing
Provide design solution service for integration project
Provide a total solution for purchasing
Sample Time
5 days for blank sample, 7-15 days for printing sample
Packing
1pc/polybag/color box/mailbox, proper pcs/ctn(As your requests)
Delivery time
30-45 days after receiving deposit and confirming sample.














Company Profile






Certifications


Ask For ISO9001:2015, ICTI, GSV Report


Competitive Advantages


1. Product Group Capacity
1.1 Product Sold (Within 12 Months)
Products Name
Quantity
Revenue(USD)
Air Mattress
60000 PCS
Confidential
1.2 Supplier Cooperated With (Within 12 Month)
No. of cooperation suppliers(total)
46
No.of suppliers (which cooperated over 2 times)
30
No. of provinces which cooperation suppliers belong to 
45 (Guangdong Province)
We would like to provide design solution service for integration project.


2. Real Case For Lower MOQ & Lead Time
Product Name
MOQ(Within 12 Months)
Lead Time
TPU Sleeping Pad
1PC
7 Days
3. Real Case For Large Contract & Lead Time
Product Name
Order (Within 12 Months)
Lead Time
Air Mattress
1000 PCS
35 Days
4. Overseas After Sales Service Capacity
4.1 Average response time
9.6 Hours




Quality Control


Quality Assurance
 1. Our company get the ISO 9001:2015 Certification, Certified by Intertek, UKAS
 2. All production line have adequate quality control. 5 QC inspectors work independently from the silk-screen printing, high frequency welding and air testing&packing production line.
 3. There is a clear procedure to conduct random product inspections after final packing.
 4. Accept the requests of the customer's designated international third party verification company to conduct the finished product inspection.




PVC Extension Test
 Pressure Test Of Air Nozzle


Pull Test of Air Nozzle

Torsion Test

Transit Test



Supplier Management
 1. Our company has a supplier assessment procedure, and has established and implemented a standard procedure for purchasing contract review and approval.
 2. Our purchasing documents are sufficient to ensure product safety control and our customers' demands.
 3. We will keep our supplier assessment reports for more than 3 years.



After Sales Service
 1. If the customer finds defective products within 3 months after receiving the goods, please provide relevant records of defective products.After confirming the situation, Sunshine will negotiate the loss according to the damage rate of defective products, and the compensation for dective products can reach 100%.
 2. In principle, we do not provide after-sales service,because we have a mandatory requirement that all products are 100%
qualified before shipment.





Production Capacity


1. Production Capacity
Product Name
Production Line Capacity
Actual Units Produced ( Previous Years)
High Rise Air Mattress
15000PCS/Month
Confidential
Lower Air Mattress
25000PCS/Month
Confidential
TPU Sleeping Pad
24000PCS/Month
Confidential
2. Production Machinery
Machine Name
Quantity
150KW High Frequency Machine
2 Sets
100KW High Frequency Machine
3 Sets
50KW High Frequency Machine
1 Sets
35KW High Frequency Machine
7 Sets
25KW High Frequency Machine
2 Sets
15KW High Frequency Machine
4 Sets
3KW-8KW High Frequency Machine
74 Sets
Printing Machine
1 Sets
Digital Printing Machine
1 Sets
Pinching Machine
2 Sets
3. Testing Machinery
Machine Name
Brand & Model No.
Quantity
Automatic Inflation& Deflation Testing Machine
1 Sets
Impact Testing Machine
1 Sets
Vibration Testing Machine
1 Sets
Tension Testing Machine
2 Sets
Aging Chamber
1 Sets
Average lead time from product order confirmation to production delivery( products existing the factory):
Product Category
Lead Time
Air Mattress
35 Days
Days
TPU Sleeping Pad
35 Days
Average Sampling Time
Product Category
Lead Time
Air Mattress
12 Days
TPU Sleeping Pad
12 Days
The Shortest Sampling Time
Product Category
Lead Time
Air Mattress
5 Days
TPU Sleeping Pad
5 Days


FAQ


1. Q: Is the factory tidy and clean enough for production?
A: Yes, very good.


2. Q: Are the following ietms/documents provided at the appropriate location?
A: Work instruction.


3. Q: How are finished products inspected?
A: 100% of products with detailed inspection.


4. Q: Would the company like to provide design solution service for integration project?
A: Yes


5. Q: Would the company like to provide a total solution foe purchasing?
A: Yes.


6. Q: Do the QA/QC inspectors work independently from the production line?
A: Yes.


7. Q: How many QA/QC inspectors in total?
A: 6 QC inspectors.


8. Q: Is there a procedure to conduct random product inspections after final packaging?
A: Yes, with clear standard and writtern inspection records.


9. Q: Do R&D employees use any specific software for designing new products?
A: Yes, PS, AI, CorelDRAW X7, Solidwork




Похожие товары

Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com