TWD100 мини-гидравлическая переносная буровая установка для бурения скважин и по низкой


Поделиться:


Цена:6 990,00 $*

Количество:



Описание и отзывы


Трекер стоимости

Месяц Минимальная цена Макс. стоимость
Sep-16-2025 8318.53 $* 8734.80 $*
Aug-16-2025 8248.65 $* 8660.11 $*
Jul-16-2025 6920.91 $* 7266.82 $*
Jun-16-2025 8108.4 $* 8513.16 $*
May-16-2025 7060.89 $* 7413.73 $*
Apr-16-2025 7969.4 $* 8367.77 $*
Mar-16-2025 7899.53 $* 8294.32 $*
Feb-16-2025 7829.97 $* 8220.39 $*
Jan-16-2025 7759.18 $* 8147.72 $*

Характеристики


TWD100 Trailer Mounted Water Well Drilling Rig


APPLICATION




TWD100A DRILLING RIG.jpg


TWD100 series drilling rig is a light, efficient and versatile drilling and drilling equipment. The drilling rig adopts two-wheeled trailer type, which makes the transition convenient and quick.TWD100 mainly suitable for drilling small-aperture wells, geothermal air-conditioning holes and other wells, especially for water intake projects in mountainous and rock formationswork efficiently under various geological structures. It is the most popular machine meeting most requirements for a combination drilling machine able to complete rural water supply holes in sediments and hard rock. Weighing about 1300kg that allows it to be pulled by a pick-up it is packed with features.










Quality Products


Beautiful Price


Excellent Service


 


 


 


COMPACT DIMENSIONS


EXTENDING UNDERCARRIAGE

STRONGER FRAME

SIMPLE CONTROL

SEASY MAINTENANCE

VERSATILITY

                     water well drilling rigS.jpg

 















DRILLING RIG.jpgWATER WELL DRIll rig.jpgdrilling rigs.jpg
Right elevation   Left elevation Front elevation



TWD100 combines an onboard power pack, drill pipe storage and foam pump on a single axle trailer. This makes for a quick set up in most locations and is an ideal multipurpose rig for many water well drilling operations.


TWD100 can drilling both by mud pump and air compressor,BW series mud pump can drill deeper faster than alternative skid mounted centrifugal mud pumps and takes its power direct from the trailer power pack. 


The machine is compact in structure and convenient to carry. The whole machine adopts full hydraulic drive and has low failure rate.The tower assembly has a hydraulic compensation mechanism. When the tower is grounded during construction, the bearing capacity is greater and the stability is higher.


SPECIFICATION

A1.jpg



PRODUCT CONFIGURATION

























Hydraulic valve.jpgdrilling rig engine.jpg     hydraulic motor.jpg
Famous Hydraulic Control Valve  YUCHAI 70KW EngineHigh Torque hydraulic Motor
  four well trailer.jpg            hydraulic pump.jpg     mud pump.jpg
Four Wheel TrailerHigh power hydraulic pump  High pressure mud pump


 PACKAGE&SHIPME

drilling rig machines.jpg



 SERVICE





SERVICE-2.jpg


 In our after sales service system, We establish excellent control system strictly according to ISO-9000 series, in this system, technology date and problem solve solution and preventive measures will be provided in any maintain project, all the spare parts will be used in new OEM products with installation instructions, packing list, manufacturer's instruction, qualification and Warranty certificate.
 
We provide "one equipment & one case, endless service, namely the after sales service begin from the order confirmation, last for the working life of the equipment.














Warranty



Spare parts


Every machine issued shall enjoy a one-year/2000 working hour warranty period, during which we will repair or replace the defective parts free of charge if material or process defects occur and spare parts are in normal working condition.

JCDRILL is dedicated to provide our clients with genuine spare parts with the highest quality,exact fitness and appropriate function.with our global distributor network,you are guaranteed with fast deliveries and services


 



ABOUT US



WHY US.jpg


JCDRILL provide users high quality Mining & Drilling solutions,we always focus on the strategic conception of "Survival by quality, Development by credit''.



We have specilized in research, development and produce of rock blasting drilling rig, water well drilling rig, diamond core drilling rig, anchor drilling rig,Mud pump and relative accessories & drilling services. constantly provide professional drilling solutions for all customers with our advanced technology, excellent equipment, strict testing means and excellent service network, which establish our brand "JINCHENG" a good image of market, now,we products account for 50% of domestic market and have been export to more than 40 countries, and we awarded ISO9001: 2000 in November, 2002. 

With excellent technology and solid market service capabilities, we have both a sound marketing system and excellent service support system, which help us win confidence of customers both at home and abroad,we can provide drilling rig users with high quality professional air compressor solution and relative after-sales service also.


FAQ


























Q: Are you original manufacturer?



Q: Which payment terms are available to us?


Q: Which Incoterms 2010 terms can we work?

A: Yes, we JCDRILL is a official leading manufacture in drilling machinery in China and we have the whole series products you need.


 


 



A: T/T term or L/C term. On T/T term, 30% down payment is required in advance, and 70%  balance shall be settled before shipment. On L/C term, a 100% irrevocable L/C without "soft clauses" can be accepted.



A: We JCDRILL are a professional and international company, accept all Incoterms 2010 terms, normally we work on FOB, CIF, CFR, CIP.


 


 



Q: How long will the delivery time take?


Q: How about after sales service?

Q:Spare Parts When You Need Them


 



A: Normally mud pump products will take about 3-15 days to produce the ordered machines. Most of the time, we can have an immediate delivery of our regular machines in 15 days.


 


 



A: 365×24 Year-round Service
We are committed to year-round 24-hour service even during holidays, in line with our policy of always providing "a response within 15 minutes and job completion within 24 hours."



A:We have spare parts centers across continents that stock specialist spare parts. We promise that spare parts will be delivered within 72 hours or no more than one week. 


 


 



 


RELATED PRODUCTS




















TWD100.jpgTWD200.jpgTWD300.jpg
 100m Water Well Drilling Rig200m Trailer Mounted Driling Rig300m Truck Water Well Drilling Rig
100% Response Rate100% Response Rate100% Response Rate

 



 



Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com