Многоразовые надувные прожекторы


Поделиться:


Цена:*

Количество:



Описание и отзывы


Трекер стоимости

Месяц Минимальная цена Макс. стоимость
Sep-18-2025 0.66 $* 0.79 $*
Aug-18-2025 0.19 $* 0.85 $*
Jul-18-2025 0.82 $* 0.97 $*
Jun-18-2025 0.20 $* 0.70 $*
May-18-2025 0.88 $* 0.78 $*
Apr-18-2025 0.12 $* 0.36 $*
Mar-18-2025 0.12 $* 0.40 $*
Feb-18-2025 0.68 $* 0.32 $*
Jan-18-2025 0.52 $* 0.74 $*

Характеристики



Project cooperation


SKYANO's flood barriers cooperated with government departments and the National Fire Service to participate in the "2014-2020 Greece-Bulgaria" plan of the European Regional Development Fun


.jpg 





Description


           Reusable inflatable flood barriers


         water-filled inflatable dams


         and fast and effective defense against floods



























































Product nameFlood barriers dam
Material

(1)0.9mm PVC [Operating temperature: -30~+70 Celsius(minus 22 degrees Fahrenheit to 158 degrees Fahrenheit)]


(Has a certain degree of corrosion resistance,)


PVC material is precision cut by CNC, cutting error 0.01mm.


Customized Plato anti-corrosion material for long-term immersion in seawater.


High frequency integrated heat sealing process.


(2)Germany TIZIP waterproof zipper


(3)Nylon with PVC handle


Size

length:10m/20m/30m/40m/50m[33ft/66ft/99ft/131ft/164ft]


diameter/height:0.8m/1.0m/1.2m/1.5m[31.5 in/39.4in/47in/59in]


Or customized


ColorOrange/custom

Each tube



1.Each pipe can be connected to each other (Longer recommendations use more connections)


2.A water inlet, as well as an adapter.(Commonly used for fire hydrant interfaces)
3.Connection kit at both ends(Suitable for a variety of tube combinations)
4.Connect the fabric and secure it with a Velcro.
5.The offered water inlet is it Store B-75mm standard.
6.Set a large drainage channel on the pipeline(Need to use waterproof zipper, we choose German brand TIZIP, length 1.1M waterproof zipper, installed on the pipe.)


Warranty3Years
OEMAvailable (add color, size, quantity, pattern, logo and etc.)
CertificationCE/EN71/EN14960/SGS/TUV
PackagePVC bag or carton
Technical[1]Internal and external double high temperature heat sealing
[2]Integrated hot press handle or steel buckle
[3]Nylon/pvc tarpaulin webbing reinforces for some parts
Delivery wayBy Express(Fedex,UPS ,DHL & TNT),by air ,by sea
Payment terms

T/T,Western Union , Escrow,PayPal and Credit Card



 


 -------------------------------------------------------------------------------------------------------------------------------


 


  Functions of flood protection dams


Flood control barriers filled with water serve for protection against flood water during flood and heavy rain. This is a much quicker, more efficient and undemanding method of protection e.g. in comparison with using sand bags. You have to decide where the barrier has to be placed and what water column it has to withstand. We use water against water. Two people are able to take the barrier out of the transport case, to unfold and to fill it. Individual tubes can be connected not only one after another, and so the needed length of trough is created, but they can be put on each other like a pyramid that can hold more water. In this way, you can create an artificial reservoir, e.g. during an intervention of fire brigades during fire fighting when they need to hold more water.The terrain can be copied and necessary angels can be created. Bags are made of resistant material so that they can be folded and used again.


  


 -------------------------------------------------------------------------------------------------------------------------------


 


Steps for usage


 


1.LAY OUT/ ROLL OUT
Place the dam elements in the target location. Loosen the straps. Roll out the dam elements.


2.INFLATE
Inflate the dam elements with a special air blower. Max. low pressure of 0.1 bar. This air blower will be supplied by Geoline Ltd.


3.CONNECT ELEMENTS
Connect the dam elements with the ratchet straps after letting out some air. Attach the straps in such a way that they sag slightly. Move the dam into the required position. Do not drag it over the ground!


4.FILL WITH WATER
Connect to a water pump and fill with water whilst letting air out at the same time. Fill both tubes at the same time. Use flood water to fill tubes where possible.


5.DURING FILLING
Make sure that the tubes do not roll away. On an inclined surface the elements lying side by side should be filled with water at the same time.


6.REMOVE AIR
Let the air out from the openings at the top. The dam elements should adopt an oval shape in the process.


7.CLOSE THE CAPS
When the dam element is half full, leave the air escape cap open until water starts to escape. Close the cap.Carefully observe the filling process and immediately stop when the filling pressure is reached.


8.CHECK FILLING PRESSURE
Max. internal water pressure 0.2 bar. Checking the filling pressure: Hold up the filling hose and take off the air escape cap. The height of the resulting water fountain must not exceed 0.5m.


 


  -------------------------------------------------------------------------------------------------------------------------------


 


                                             Production process pictures


 


.jpg


 


 





Certifications


.jpg


 


-.jpg 





Photo


-------------------------------------------


The following pictures were taken independently by SKYANO using professional cameras and protected by Alibaba and the law. 


10x0.8m1.jpg10x0.8m2.jpg10x0.8m3.jpg10x0.8m4.jpg10x0.8m5.jpg10x0.8m6.jpg10x0.8m7.jpg10x0.8m8.jpg10x0.8m9.jpg10x0.8m10.jpg10x0.8m12.jpg


 


-------------------------------------------


 





FAQ


------------------------------------------------------------------------------------------------


 


     Can I print the customer's logo?


      Yes, can print logos and patterns.


 


     What certificates do you have?


      We have SGS, UL, CE, EN71, EN14960 certificate, Our factory has GSV & ICTI factory                  audit. EN71,EN14960,CE/UL blower


 


     Can you accept Small order quantity?


      Yes,1pc is also OK


 


     Accept the size I want to customize?


      Yes, I will let the designer design for you. According to the actual situation, make the                      appropriate size for use.


 


    Your payment term and shipping term ?                         


       We accept T/T, Western Union, Chinabank, and paypal.


     It depends on the dimension of thegoods and weight,


     We usually deliveryby air, boat, and Express( DHL, FedEx,EMS)


 


    Can I visit the factory?


     Yes, always welcome.


 


 


------------------------------------------------------------------------------------------------


 




Похожие товары

Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com