Поделиться:
Месяц | Минимальная цена | Макс. стоимость |
---|---|---|
Aug-18-2025 | 1.48 $* | 1.4 $* |
Jul-18-2025 | 1.97 $* | 1.27 $* |
Jun-18-2025 | 1.2 $* | 1.61 $* |
May-18-2025 | 1.13 $* | 1.26 $* |
Apr-18-2025 | 1.82 $* | 1.16 $* |
Mar-18-2025 | 1.6 $* | 1.60 $* |
Feb-18-2025 | 1.69 $* | 1.24 $* |
Jan-18-2025 | 1.55 $* | 1.38 $* |
china supply construction water based underground polyurethane waterproof coating
Product Description
ZERO-SL PU110
Eco-friendly Waterproof Coating
Paint Concrete Floor PU Mositure Curing Waterproofing Materials
Odorless, Eco-friendly, No Harm to the Builder
Excellent Waterproof, Best Sealing, Bright Color
uResistant to Oil, Acid, Alkali ,Puncture, Chemical Corrosionu
Single Component, Self-leveling, Easy to Use, Convenient Operation
500%+ Elongation, Super-bonding without Crack
Resistance to Tear, Shifting, Settlement Joint
Applications :
1. Waterproofing and moisture proofing for kitchen, bathroom, balcony, roof and so on.
2. Anti-seepage of reservoir, water tower, water tank, swimming pool, bath, fountain pool, sewage treatment pool and drainage irrigation channel.
3. Leak-proofing and anti-corrosion for ventilated basement, underground tunnel, deep well and underground pipe and so on.
4. Bonding and moisture proofing of all kinds of tiles, marble, wood, asbestos and so on.
Technical Data Table:
PROPERTY | PU110 |
|
|
Color | Black,White,Blue,Grey (Customized ) |
|
|
Density (g/cm³) | 1.35±0.1 |
|
|
Tack Free Time (Hr) | 8 |
|
|
Tensile Strength (Mpa) | >2 |
|
|
Curing Speed (mm/24h) | 3 ~ 5 |
|
|
Elongation at Break (%) | >550 |
|
|
Solid Content (%) | >90 |
|
|
Operation Temperature ( ℃) | 5-35 ℃ |
|
|
Service Temperature ( ℃) | -40~+80 ℃ |
|
|
Shelf Life (Month) | 9 |
|
|
Implementation of standards: GB / T19250-2013.
|
Operation:
First Step
Brushing the part like corner, tubes root, then symmetrical scraping. The thickness of the coating is generally 0.5mm. (Avoid bubble). When operation,It should be considered about the size, shape and environment of the construction area.
Second Step
Symmetrical scraping when the coating is completely solidified (about 12 hours later). The thickness of the coating should be 0.7mm, and the direction of smearing should be perpendicular to the first time. The specific operation is the same as the first step.
Third Step
Symmetrical scraping when the coating is completely solidified (about 12 hours later). The direction of smearing should be perpendicular to the second time. The specific operation is the same as the first step.The operation times depends on the design thickness, the overall thickness is 2.0-2.2mm.
Packaging & Shipping
Packaging Details:
1Kg Bucket /5Kg Bucket / 20Kg Bucket / 25Kg Bucket / 230kg Bucket are available
Shipping:
1. By express(FEDEX)
2. By sea (FCL/LCL)
3. By Railway
Our Services
FAQ
Q: Delivery time?
A: Normally 3-7 days after receive your payment .
Q: Can I get samples?
A:Yes , 1KG Tin /5kg Bucket samples are available .
Q: What is your MOQ?
A: Our MOQ is 1000kg for black /White /Grey / Blue color, 5000kg for customized color
Q: Can you do OEM lable for the products?
A: YES, We can
Any more questions, please contact us anytime!
Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com