Поделиться:
Месяц | Минимальная цена | Макс. стоимость |
---|---|---|
Sep-19-2025 | 0.11 $* | 0.41 $* |
Aug-19-2025 | 0.51 $* | 0.89 $* |
Jul-19-2025 | 0.22 $* | 0.61 $* |
Jun-19-2025 | 0.61 $* | 0.87 $* |
May-19-2025 | 0.2 $* | 0.19 $* |
Apr-19-2025 | 0.90 $* | 0.7 $* |
Mar-19-2025 | 0.65 $* | 0.79 $* |
Feb-19-2025 | 0.41 $* | 0.62 $* |
Jan-19-2025 | 0.90 $* | 0.21 $* |
Main technical parameter
Model | QY-1 | QY-2 | QY-3 | QY-4 | QY-6 | QY-8 |
Motor Power(KW) | 1.5 | 2.2 | 1.1×3 | 1.5×4 | 1.1×6 | 1.1*8 |
Qty of Caterpillars | 2 | 2 | 3 | 5 | 6 | 8 |
Effective Length(mm) | 800 | 1200 | 1600 | 2000 | 2800 | 3000 |
Here I only offer one of our 2 caterpillars haul off machine for your reference.
there are belt or rubber bricks type.
driving motor can be installed one for whole machine;
and motors also can be installed one by one for each caterpillar,then machine running is more stable.
- Packaging: poly-wooden cases for Plastic pipe haul off machine QY-I, no need fumigate; bubble films packaging
- We suggest the customer to purchase poly-wooden case packaging; if no, we will fixed the machines on containers walls with steel wires
- Shipping: By Sea or Train
- pre-sales services: we will take customers to visit our factory and check the machines quality from airport/bus station/train stations
- we will re-designed the machines according to customer's different raw material formulations: driving motors power, electric power model, wall thickness of barrel, control method
- after sales services: we will offer electric diagram, installation diagram, usage manual
- we will offer the customers online introduction to solve the machines problems/send engineers for customers machines installation, running test, workers training, machines repairmen services.
- we will offer customers spare parts at cost prices all life long of the machines.
- BEIERMAN MACHINERY was established by three skilled technician/engineer/sales for plastic extruding line, plastic recycling lines producing, sale and services.
- We have 3000 square meters working house for machines making, there are 40 workers for machines producing and a 5 engineers service team for the machines running test, installation, workers training and machines repairmen.
- we have already get CE and ISO9001 corticated for our machines and factory, which ensured the high quality level of all machines we are producing
- we will attend several home and abroad plastic machines industry fairs to show the customers our quality, machines and services.
- there will be 1-2 new produced machines will be showed to the customers every year.
- we already established cooperation with the customers from Middle East, Southeast Asia and south America countries.
Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com