Manufacturers low-cost promotion artificial snow


Поделиться:


Цена:27 000,00 $ - 30 880,00 $*

Количество:



Описание и отзывы


Трекер стоимости

Месяц Минимальная цена Макс. стоимость
Sep-17-2025 32130.21 $* 33737.98 $*
Aug-17-2025 31860.91 $* 33453.15 $*
Jul-17-2025 26730.19 $* 28067.51 $*
Jun-17-2025 31320.91 $* 32886.86 $*
May-17-2025 27270.0 $* 28634.18 $*
Apr-17-2025 30780.17 $* 32319.4 $*
Mar-17-2025 30510.92 $* 32036.19 $*
Feb-17-2025 30240.43 $* 31752.80 $*
Jan-17-2025 29970.61 $* 31469.74 $*

Характеристики


Product Description
\t
Production volume
\t
90m³
\t
Rotation angle
\t
360°
\t
Head up
\t
45°
\t
Range distance
\t
20-70m
\t
Number of nozzles
\t
45
\t
Bracket tires
\t
 3
\t
Working water pressure
\t
8-40bar
Detailed Images

1. Snow is made at a critical zero temperature, and the amount of snow produced per hour is 30 to 90 cubic meters.

2. The air duct of the snow machine can be rotated and pitched, rotated 360° horizontally, and tilted from 0° to 45°. It covers a wide range of snow and forms a uniform snow layer.

3. The range is as long as 20-70 meters, and the skiing operation in the ski resort is completed quickly.

4.45 nuclear nozzles (the number of nuclear nozzles) is conducive to the formation of snow nucleus, ensuring the excellent snow quality, easy to save, and reducing the number of snow filling. According to the temperature of the site, all the opening or partial opening can be selected, that is, the amount of snow used is guaranteed, and the energy is saved.

5. Independent research and development production, novel style, high quality assurance, factory direct sales cost-effective snow machine.

1. Fan-type high-pressure snow machine can make snow cover more, and the bracket and 3 tires make it more convenient to move.

2. Aluminum nozzles that can be adjusted in two steps. According to actual needs, these nozzles can be increased or decreased at any time, which not only improves work efficiency, but also saves energy consumption.

3. The snow machine has indicator lights, and it can successfully complete the task at night. The working water pressure is 8-40bar, which is adjusted in time.

1. It can adjust the swing angle of the snow machine moderately, and the snow making effect is better to achieve the expected snow cover area.

2. After the switch is confirmed to be closed, connect the power supply.

3. Before moving the snow machine, coil the cable tray and move the snow machine.

4. Water hoses and cables should be avoided from being buried by newly built snow, not to cross the transport corridor.

5. Before connecting the water hose to the water inlet of the snow machine, it should be cleaned.

6. Rotate the direction of the barrel of the snow machine. Do not use the snow machine in the direction of the wind. Try to keep the nozzle in a downwind or sidewind position.

7. Roll out the water hose and connect it to the water supply port of the closed ski resort, and connect it to the water inlet of the snow machine.

Packing & Delivery

Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com