Роскошные многоэтажные модульные сборные стальные рамы для


Поделиться:


Цена:30,00 $ - 50,00 $*

Количество:



Описание и отзывы


Трекер стоимости

Месяц Минимальная цена Макс. стоимость
Sep-16-2025 36.82 $* 38.71 $*
Aug-16-2025 35.15 $* 37.61 $*
Jul-16-2025 30.34 $* 32.48 $*
Jun-16-2025 35.29 $* 37.38 $*
May-16-2025 30.41 $* 32.90 $*
Apr-16-2025 34.65 $* 36.74 $*
Mar-16-2025 34.93 $* 36.56 $*
Feb-16-2025 34.42 $* 36.72 $*
Jan-16-2025 33.54 $* 35.31 $*

Характеристики


1.jpg


 


European standard large-span prefabricated


steel structural building


 


 


 


 


2.jpg3.jpg


4.jpg


 


 


 






















































Main Parts



Item Name



Specification



Main Steel Frame



Column



Q235B, Q345B                        


H shape, Box, Steel pipe, Hot rolled steel



Beam



Q235B, Q345B 


H-beam 



Finish


 Shot blasting Sa 2.5, Zinc Rich Epoxy primer finish 100um

Supporting System



Brace



Q235B, Q345B ,  


Steel rod, Steel pipe, Angle steel. Galvanization 275g/m2



Roof Purlin



C or Z shape, Steel purlin



Wall Purlin



Q235B, Q346B


C or Z shape, Steel purlin



Roof



0.45/0.5/0.6mm corrugate steel sheet (Aluminum & Zinc coated AZ100g/m2+surface painting 20/5um)


50/75/100mm EPS,  Rock wool, PU, Glass wool sandwich panel 


Wall

0.45/0.5/0.6mm corrugate steel sheet (Aluminum & Zinc coated AZ100g/m2+surface painting 20/5um)


50/75/100mm EPS,  Rock wool, PU, Glass wool sandwich panel



Accessories



Bolts



Ordinary, High strength



Gutter



Galvanized Steel, Stainless steel



 


 


 


 


5.jpg


 


 


 


 













1.jpg

1.jpg


  1.jpg

 


 


 


Click CONTAINER HOUSE for more information.


 


 


 


6.jpg7.jpg


1.Contact us

Contact us by Phone/Email/LinkedIn/WeChat

2.Drawing and Quotation

Tell us what you want,our sales man and designer give you the best proposal.

3.Finalize contract

Finalize details for price,payment,shipment time,and sign the contract.

4.Producing

Start production upon receipt of down payment,the sales follows up the producing progress.

5.Inspection

QC team will make routine inspection in each process,and provide inspection report.

6.Packing&Shipment

Packing all the parts onto the steel rack , load into the shipping container ; contact shipping forwarder and ship to the final port as customer directed.

7.Install

PTH provide complete installation drawing,or PTH send engineer to the site to give the installation guidance.

8.After-sale service

Anytime,any problem,our sales man and engineer will try our best to help your solve it.

 

 


FAQ


1. Do you provide on-site installation service?


1) Only large projects provide installation services


2) General projects, we can provide Installation guide service based on customers’ request.


3) Installation supervision charge standard: 150USD/day, customer should responsible for the travel fee, accommodation, translation fee, and ensure staff’s health and safety.


 


2.What’s your delivery time? 


Salesman will confirm the time accordingly, large order should communicate with order management department in advance. Normally, delivery time is 45days after receive deposit. Large order delivery time should be arranged separately.


 


3.How to control the quality of your product?


a. quality of the design: think about possible problems in advance and provide a high-quality design solution.


b. quality of the raw material: choose the qualified raw material


c. quality of the production: precise manufacturing technique, experienced workers, strict quality inspection.


 


4. How to deal with quality problems?


Warranty is 3 years. Within the warranty period, PTH will responsible for all quality problems caused by production.


 


5. If there is a clear service life of your products? If have, how long?


Under conventional climate and environment, steel structure whole building 25 years, main structure 20 years, protecting system 10 years. 


 


6. What designs do you have in different climates (How can the products adopt to different climates)?


Strong wind region:   improve the wind-resisting ability of the internal structure.


Cold region: increase the thickness of the wall, or use good insulation material, improve anti-pressure ability of the structure.


High corrosion region: use corrosion resistant material, or paint anticorrosive coating.




Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com