Поставщик сборных домов для школьного строительства проектирования и


Поделиться:


Цена:*

Количество:



Описание и отзывы


Трекер стоимости

Месяц Минимальная цена Макс. стоимость
Sep-20-2025 0.0 $* 0.7 $*
Aug-20-2025 0.79 $* 0.32 $*
Jul-20-2025 0.10 $* 0.33 $*
Jun-20-2025 0.70 $* 0.54 $*
May-20-2025 0.33 $* 0.80 $*
Apr-20-2025 0.27 $* 0.73 $*
Mar-20-2025 0.70 $* 0.31 $*
Feb-20-2025 0.32 $* 0.36 $*
Jan-20-2025 0.68 $* 0.79 $*

Характеристики


Prefabricated sandwich panel house school building


1.jpg


No.1 prefab house supplier and sandwich panel house school building design and manufacturing


/


2.jpg


PX6A0699


3.jpg4.jpg


 


They are all air-tight, heat-tight, warm-keeping, water-proof and anti-corrosive.  



















































S/N



Item Name



Specification



1



Main Steel Frame



light gauge steel ,Q345B galvanization 275g/m2



2



Wall System



 EPS/PU/rock wool sandwich panel


 ALC panel (autoclaved lightweight concrete)



3



Roof System


Corrugated Sandwich Panel

4



Door



Steel door/sandwich panel door


5

Window



Aluminum/PVC window


6

Ceiling



Gypsum board/PVC/steel plate


7

Floor



Fiber cement board/wooden floor/PVC/ceramic tile


8

Electricity&Plumbing



Customized as clients' requests and local standard



 /5.jpg


















1


Australia   Container house    30units



2


Las vegas   Steel structure hotel   3000m2



1


Sweden  steel structure warehouse   1500m2



2.jpg


Gabon Africa    Steel structure hotel    9350m2





 Click CONTAINER HOUSE for more information.




 /


6.jpg7.jpg


/

1.Contact us

Contact us by Phone/Email/LinkedIn/WeChat

2.Drawing and Quotation

Tell us what you want,our sales man and designer give you the best proposal.

3.Finalize contract

Finalize details for price,payment,shipment time,and sign the contract.

4.Producing

Start production upon receipt of down payment,the sales follows up the producing progress.

5.Inspection

QC team will make routine inspection in each process,and provide inspection report.

6.Packing&Shipment

Packing all the parts onto the steel rack , load into the shipping container ; contact shipping forwarder and ship to the final port as customer directed.

7.Install

PTH provide complete installation drawing,or PTH send engineer to the site to give the installation guidance.

8.After-sale service

Anytime,any problem,our sales man and engineer will try our best to help your solve it.

 


FAQ


1. Do you provide on-site installation service?


1) Only large projects provide installation services


2) General projects, we can provide Installation guide service based on customers’ request.


3) Installation supervision charge standard: 150USD/day, customer should responsible for the travel fee, accommodation, translation fee, and ensure staff’s health and safety.


 


2.What’s your delivery time? 


Salesman will confirm the time accordingly, large order should communicate with order management department in advance. Normally, delivery time is 45days after receive deposit. Large order delivery time should be arranged separately.


 


3.How to control the quality of your product?


a. quality of the design: think about possible problems in advance and provide a high-quality design solution.


b. quality of the raw material: choose the qualified raw material


c. quality of the production: precise manufacturing technique, experienced workers, strict quality inspection.


 


4. How to deal with quality problems?


Warranty is 3 years. Within the warranty period, PTH will responsible for all quality problems caused by production.


 


5. If there is a clear service life of your products? If have, how long?


Under conventional climate and environment, the service life of double C structure is 20 years


 


6. What designs do you have in different climates (How can the products adopt to different climates)?


Strong wind region:   improve the wind-resisting ability of the internal structure.


Cold region: increase the thickness of the wall, or use good insulation material, improve anti-pressure ability of the structure.


High corrosion region: use corrosion resistant material, or paint anticorrosive coating.




Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com