Твердых бытовых отходов завод по переработке изношенных автошин мусора и повторно использовать разделительный экран для


Поделиться:


Цена:*

Количество:



Описание и отзывы


Трекер стоимости

Месяц Минимальная цена Макс. стоимость
Sep-17-2025 0.40 $* 0.48 $*
Aug-17-2025 0.61 $* 0.94 $*
Jul-17-2025 0.58 $* 0.64 $*
Jun-17-2025 0.61 $* 0.63 $*
May-17-2025 0.14 $* 0.9 $*
Apr-17-2025 0.98 $* 0.31 $*
Mar-17-2025 0.75 $* 0.10 $*
Feb-17-2025 0.33 $* 0.52 $*
Jan-17-2025 0.42 $* 0.93 $*

Характеристики


Municipal solid waste recycling machine plant garbage separation screen 



Product Description


trommel screen1


MSW trommel has always been the bottleneck of waste treatment skills. Whether it is incineration, landfill or comprehensive treatment, there are many failure cases due to incomplete classification of waste, which makes the next process unable to process and the entire production line cannot operate normally.  The domestic dirt is transported into the dirt truck, after weighing, the dirt truck enters the turning workshop of the dirt truck, the dirt is discharged in the dirt temporary storage room, and the deodorant is sprayed at the same time. The materials are sent to the uniform feeder by the bridge-type double beam grab crane, and sent from the uniform feeder to MSW trommel screen.


 


This machine can separate the whole large dirt, 90% of the sand and soil in the dirt, 25-35% of the reusable dirt, and 90% of the big bag of dirt can be broken by bag opening system. The remaining part can be processed by a bag crusher. This machine can fully open the entire unopened bag of dirt in the dirt, disperse the debris sticking to the plastic, and crush objects with a particle size greater than 600mm to less than 60mm Of recyclables. 


 


 trommel screen 


Solid waste/life garbage/waste processing system with ISO & CE approval


 





Working Principle


1. lowering initial investment cost (comparative price)    


2. saving operational cost (outstanding durability and simple mechanical structure)


3. reducing any additional cost in the future (high productivity & mobility)


4.High gold dust gathering capability by long-time and non-stop operation


 


 





technical parameters


 












































































Model



Capacity


(t/h)



Power


(kw)



Diameter


(mm)



Length


(mm)



Discharge


(mm)



Input


(mm)



Dimension
((mm)



YGTS1020



10-30



4.0



1000



2000



0-100



≤300



3390×1400×2140



YGTS1225



30-50



5.5



1200



2500



0-100



≤300



4146×1600×2680



YGTS1545



50-120



11



1500



4500



0-100



≤400



8160×2300×2500



YGTS1548



80-150



11



1500



4800



0-100



≤400



8460×2300×2500



YGTS1848



100-200



15



1800



4800



0-100



≤400



8460×2300×2700



YGTS2060



200-350



30



2000



6000



0-100



≤400



9680×2300x3420



 Solid waste/life garbage/waste processing system with ISO & CE approval


if you need more photos and video , please click here to contact me :





Packaging & Shipping


 Solid waste/life garbage/waste processing system with ISO & CE approval





Case


MSW rotary screen 8msw trommel 4msw trommel 5MSW trommel screen (2)MSW sorting lineMunicipal Solid Waste MSW Construction & Demolition Rotary Screener


 


if you need more photos and video , please click here to contact me :





Company Information


9-about-us8-why-chonnse-us


Solid waste/life garbage/waste processing system with ISO & CE approval


Solid waste/life garbage/waste processing system with ISO & CE approval


 


if you need more photos and video , please click here to contact me :





FAQ


Question 1: Can you give me a solution and quotation?


Answer: Absolutely sure, we can provide accurate solution and quotation, please give us background information, including, raw material, the capacity, max. input size, the output size, the usage of final products, etc. 


 


Question 2: Way of payment
Answer: Welcome clients place the order by alibaba online one-touch! Deya also offers various ways of payment, T/T, against copy of B/L, L/C, D/A, D/P, West union, etc. All can be negotiated.


 


Question 3: What’s the delivery time after I pay the deposit ?  


Answer: Normal delivery time within 10 to 20 working days, complete production line or larger equipment may take longer. Exact delivery shall be confirmed when place the order. 


 


Question 4: After order equipment how do we slove the equipment installing?


Answer: For a small single equipment, we offer you user manual, customer will install and commissioning as operating introduction; For a complete production line, we will send our engineer to your workplace to help you install and commissioning untill machines work normally. Sinolion has several experienced technicians with passports ready to go for installation, when installation service is needed, the client should pay for technicians’ round way air tickets, salary(shall be confirmed before leaving), food and lodging, most importantly to guarantee the technicians’ safety.


 


Question 5: How long of your machine quality guarantee terms?


Answer: Equipment from Zhengzhou Sinolion Machinery Co., Ltd. with 18 months warranty, can be extended to 24 months as request.


 


 





Contact Us


 If you have interest on our machine or have questions on our machine, please don't hesitate to contact us.


Ella contact information


 




Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com