Высококачественный зажим панели опалубки peri BFD long L434


Поделиться:


Цена:*

Количество:



Описание и отзывы


Трекер стоимости

Месяц Минимальная цена Макс. стоимость
Sep-16-2025 0.42 $* 0.1 $*
Aug-16-2025 0.43 $* 0.47 $*
Jul-16-2025 0.49 $* 0.81 $*
Jun-16-2025 0.55 $* 0.0 $*
May-16-2025 0.14 $* 0.10 $*
Apr-16-2025 0.79 $* 0.51 $*
Mar-16-2025 0.97 $* 0.98 $*
Feb-16-2025 0.39 $* 0.28 $*
Jan-16-2025 0.39 $* 0.33 $*

Характеристики


High quality peri BFD long L434 ZB formwork panel clamp  


 














































Item



formwork panel clamp



Material



SS400+Q345+45/etc



Dimensions



430/434mm formwork clamp



Surface



Hot-dip galvanization/ electro galvanization /painted/or as your request



Standard



UN,BS,JIS,ISO9001:2008



Note



OEM service is available



MOQ



100pieces



Package



in steel plate or plywood plate, or as your request



Payment Terms



TT,L/C, we can contact in detail



Delivery Time



20-30days



 


 


  


Company Strength:


TY0081 (1).jpgTY0021.jpgTY0022.jpgTY0023.jpgTY0024.jpgTY0035.jpgTY0045.jpg 


05


 


 


Package:


 


package


 


 


Related products


 


formwork parts 01.jpgformwork parts 02.jpgformwork parts 03.jpg



FAQ


 


1. Q: What's your MOQ(minimum order quantity)?


 


    A: Any quantity for the sample and stocks..


 


2. Q: What's your packing methods?


 


    A: Packed into plywood box/ton bag, or in bulk.


 


3. Q: What's your payment terms?


 


    A: T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/C 100%, or negotiate according to the order status.


 


4. Q: What's your delivery time?


 


    A: 10-20 days after received the advance payment or L/C.


 


5. Q: Are you manufacturer or trader?


 


    A: We are the munafacturer of SCAFFOLDINGS MATERIALS for years, coveraged every scaffolding systems.


  


6. Q: Can we visit your factory?


 


    A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.


 


7. Q: Can you supply other formwork materials?


 


    A: Yes. All related formwork and scaffolding building materials.


 


        (1) scaffolding system (ring lock system, frame, pipe&coupler system)


 


        (2) scaffolding pipes (1.5'-2.0')x(0.3-12m), hop dipped galvanized / black. BS1139, STK500


 


        (3) steel pipes (ERW BS1387, SSAW PIPE, Sqaure/ Rectangular tube GB/T6728)


 


        (4) steel coupler (preesed / drop forged)


 


        (5) steel plank with / without hooks


 


        (6) steel stair case


 


        (7) screw adjustable base jack


 


        (8) adjustable shoring props


 


        (9) steel and aluminium formwork accessories, such as wing nut, panel clamp, water stopper, etc


 


        (10) concrete embedded parts




 


Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com