Поделиться:
Месяц | Минимальная цена | Макс. стоимость |
---|---|---|
Aug-15-2025 | 1713.64 $* | 1747.27 $* |
Jul-15-2025 | 1389.41 $* | 1417.16 $* |
Jun-15-2025 | 1686.89 $* | 1720.2 $* |
May-15-2025 | 1673.35 $* | 1706.1 $* |
Apr-15-2025 | 1336.32 $* | 1363.74 $* |
Mar-15-2025 | 1646.86 $* | 1679.54 $* |
Feb-15-2025 | 1632.53 $* | 1665.55 $* |
Jan-15-2025 | 1619.73 $* | 1651.94 $* |
* Introduction
Toast moulder is a good machine to produce the toast bread , applicable for the degassing and shape repairing of bread such as toast, hot-dog and French roll.
Toast moulder | HMK-380L | Capacity: 1000-3000 pcs/h Voltage:~220/380V Power:0.75 kw Size:580*1340*1100 mm Net Weight:225 kg |
Baguette Moulder | HMK-750 | Capacity: 50-1250 pcs/h Voltage:220/380V Power:1.0 kw Size:980*1010*1580 mm Net Weight:285 kg |
You could click on the following picture to learn more.
Shanghai Honglian Machine Electric Appliance Co.,Ltd was established in 2000 year, which is a professional manufacturer of high quality food processing machinery. Our mainly products are all kinds of high quality bakery ovens, proofers, pressure fryers, pancaking ovens, duck roaster, drying oven, dough mixer and all kinds of bakery equipment.
We have a strong ability which manufacturing the equipment in minimal time. Our clients are from all of the world, Europe, Middle-East, Aisa, Africa, American.
Q1:Are you a trading company or factory?
A:We have a factory located in Shanghai city,China and welcome to have a visit at any time.
c
Q2:Can you make it according to our design?
A:Yes, we can do as our client's requirements.
Q3:What products do you manufacture?
A:We manufacture the baking equipments,including all kinds of Oven,Permentation Room,Pressure Fryer,Duck Roaster,Mixing equipments, etc.
Q4:What is your minimum order quantity(MQQ)?
A:We are a manufacturer.Trial orders are also acceptable and welcome.
Q5:How can l pay for my order?
A:Trade assurance on alibaba.com though T/T,VISA,MASET CARD.
Q6:What are the shipping costs?
A:Shipping cost is based on number of packages,gross weight of those packages,total package volume and destination port.
Q7:How about the delivery time?
A:Some of the products are in stock at our warehouse,generally we need 3~5 days to change the plugs and package them before the delivery.Regarding the non-stock products,the lead time 10~30 days depends on your requirements on the products.
Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com