Описание и отзывы
Трекер стоимости
Месяц |
Минимальная цена |
Макс. стоимость |
Sep-16-2025 |
0.78 $* |
0.41 $* |
Aug-16-2025 |
0.77 $* |
0.84 $* |
Jul-16-2025 |
0.66 $* |
0.69 $* |
Jun-16-2025 |
0.1 $* |
0.91 $* |
May-16-2025 |
0.54 $* |
0.89 $* |
Apr-16-2025 |
0.11 $* |
0.12 $* |
Mar-16-2025 |
0.69 $* |
0.85 $* |
Feb-16-2025 |
0.29 $* |
0.49 $* |
Jan-16-2025 |
0.41 $* |
0.65 $* |
Характеристики
Top Garden NB411-1 small engine brush cutter carburetor
![muban_01.jpg]()
![]()
Material | aluminium alloy |
Model | NB411-1,RBC411-1,40-6 |
Displacement | 40.7CC |
Application | Brush cutter |
Product name | 139f carburetor |
Certificate | ISO9001:2000 |
Quality | High |
Engine | 1E40F-6 |
Commodity name | Carburetor |
Business type | Manufacturer |
![muban_03.jpg]()
![]()
![]()
Basics:
A carburetor basically consists of an open pipe through which the air passes into the inlet manifold of the engine.
The pipe is in the form of a Venturi: it narrows in section and then widens again, causing the airflow to increase in speed in the narrowest part.
Below the Venturi is a butterfly valve called the throttle valve — a rotating disc that can be turned end-on to the airflow, so as to hardly restrict the flow at all, or can be rotated so that it (almost) completely blocks the flow of air.
This valve controls the flow of air through the carburetor throat and thus the quantity of air/fuel mixture the system will deliver, thereby regulating engine power and speed. The throttle is connected, usually through a cable or a mechanical linkage of rods and joints or rarely by pneumatic link, to the accelerator pedal on a car, a throttle level in an aircraft or the equivalent control on other vehicles or equipment.
Fuel is introduced into the air stream through small holes at the narrowest part of the Venturi and at other places where pressure will be lowered when not running on full throttle. Fuel flow is adjusted by means of precisely calibrated orifices, referred to as jets, in the fuel path.
![muban_07.jpg]()
1.Brand ABC has over 16 years' experience of the parts,this is the only thing wo are doing and will keep doing in the last 16years.
2.Lead time ABC' common lead time is3-7 days for samples; 10-25 days for batch goods.
3.Skill ABC has own sepcialty team for the new modles,so all kinds of OEM parts are available.
4.Service ABC will reply all requests within 12hours
Shipping
1. FedEx/DHL/UPS for samples, Door-to-Door;
2. By Sea for batch goods, Port receiving;
3. Customers specifying freight forwarders or negotiable shipping methods.
4. Delivery Time: 3-7 days for samples; 10-25 days for batch goods.
Payment Terms
1. Payment: T/T, L/C,Western Union
2. MOQ: 100pcs
3. Package Informations: 100 pcs per box
![muban_12.jpg]()
Send your Inquiry Details in the Below, Click "Send" Now! We are waiting for you.