Поделиться:
Месяц | Минимальная цена | Макс. стоимость |
---|---|---|
Sep-18-2025 | 0.8 $* | 0.15 $* |
Aug-18-2025 | 0.73 $* | 0.29 $* |
Jul-18-2025 | 0.34 $* | 0.12 $* |
Jun-18-2025 | 0.75 $* | 0.41 $* |
May-18-2025 | 0.48 $* | 0.19 $* |
Apr-18-2025 | 0.8 $* | 0.8 $* |
Mar-18-2025 | 0.13 $* | 0.19 $* |
Feb-18-2025 | 0.40 $* | 0.84 $* |
Jan-18-2025 | 0.1 $* | 0.82 $* |
1.The customer should provide the size of the lighting truss system, including width, length, height and loading.
2..The customer should tell us whether you need the roof and canvas.
3.The customer should tell us where will you used the truss. (outdoor or indoor,mobile or fixed)
4.We design the truss depend on the above information.
5.We can revised the truss design until the customer satisfied.
6.After receiving the deposit, we arrange production according to the drawing.
7.After finishing all of the truss products, we will try to install this set of truss system to make sure no mistake and take video or photo for the customer.
8. When the customer satisfied with us, pls pay the balance, we will pack all of the goods and arrange transportation for you.
Packing Details : Packing, \tAir Bubble film or for your requirement
Delivery Details : 25-30 days after order of Solid bicycle tire tubes
A: We are factory.
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample.
Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com