Поделиться:
Месяц | Минимальная цена | Макс. стоимость |
---|---|---|
Sep-15-2025 | 0.78 $* | 0.73 $* |
Aug-15-2025 | 0.3 $* | 0.42 $* |
Jul-15-2025 | 0.89 $* | 0.16 $* |
Jun-15-2025 | 0.6 $* | 0.26 $* |
May-15-2025 | 0.23 $* | 0.31 $* |
Apr-15-2025 | 0.58 $* | 0.59 $* |
Mar-15-2025 | 0.47 $* | 0.3 $* |
Feb-15-2025 | 0.62 $* | 0.60 $* |
Jan-15-2025 | 0.43 $* | 0.98 $* |
\t | \t |
\t | \t |
\t | \t |
\t | \t |
\t | \t |
\t | \t |
\t | \t |
\t | \t |
Our Workshop
1, Reducing the costs of PCB’s production, inspection, maintenance ,etc.
2, Easing for SMT production, and preferably dividing the shielding area in order to strengthen the shielding’s effect.
3, Shielding clip has good elasticity, and easy to be welded, and apply to SMD packaging.
4, After SMT production , then put the shielding case with shielding clip on PCB. Once need to maintenance PCB , just need directly removed the shielding case from the shielding clip,
.
and no longer need to remove it by high temperature which can avoid the high temperature will destroy the motherboard. Highly reduces the damage rate of repairing board. So Shielding clip is the best product of replacing the shielding frame.
5, Shielding clip’s production craft, material, weldability , flatness and packaging requirements are more economic than producing shielding frame.
Packing Details : 10000pcs/reel+carton boxes
Delivery Details : Generally it is 3-4 days if the goods are in stock. or it is 5-7 days if the goods are not in stock, it is according to quantity.
A: We are factory.
A: Generally it is 3-4 days if the goods are in stock. or it is 5-7 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as below:
Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com