[EU Delivery]Square CNC 2.2KW Air Cooled Spindle Motor ER20 runout-off 0.01mm


Поделиться:


Цена:213,90 $ - 223,90 $*

Количество:



Описание и отзывы


Трекер стоимости

Месяц Минимальная цена Макс. стоимость
Aug-17-2025 271.27 $* 276.14 $*
Jul-17-2025 219.42 $* 223.5 $*
Jun-17-2025 266.43 $* 271.12 $*
May-17-2025 264.65 $* 269.16 $*
Apr-17-2025 211.28 $* 215.6 $*
Mar-17-2025 260.69 $* 265.41 $*
Feb-17-2025 258.63 $* 263.65 $*
Jan-17-2025 256.52 $* 261.77 $*

Характеристики



Good News: New this items have arrived DE/US warehouse, welcome you to purchase.


We have DE/US/RU Warehouse ,so we can ship from local warehouse to European Union,US and Russsia, You can enjoy more faster delivery, free VAT, and need not do customs clearance.

 

 

Package include:


1 x 2.2Kw Square  Air cooled spindle motor (ER20,220V,24000rpm,4 bearing,400Hz)


 


2.2KW ER20 Square Air-cooled Spindle motor Engraving milling Grind


Specification:


Material: Stainless Steel


Size:  


Power: 2.2Kw


Voltage: 220VAC


Current: 6A


Frequency: 400 Hz


Speed: 24000 rpm


Cooling: Air-cooled


Runout off: Less than 0.01mm


Bearing Lubrication: Grease


Collet size:ER20


Bearings: 4 Ceramic bearing


Power Interface:


Wiring:The spindle’s 1 connect Inverter’s U,spindle’s 2 connect Inverter’s V,spindle’s 3 connect Inverter’s W,spindle’s GND connect Ground,Spindle’s 4 and 5 connect thermistor,no need connector,the inverter’s R S T any 2 pins connect 220VAC


Net Weight: 4.9kg


Main application: Wood, Aluminum, Stone, metal, glass, PVC industry


 





 




1. Structural features


1) High speed electric main bearing all adopt the Ceramic bearing, axis sets of loading, Improve spindle in the high-speed rotation supporting stiffness and precision grinding.


2) Before driving, rotation of the shaft by hand.Spindle high speed rotation caused by temperature rise, use of cooling liquid circulating system to eliminate.




2. Instructions for use


1) In use, must first connect the cooling water pipe, make spindle connect cooling water and then start.


2) Before driving, turned by hand spindle. If sensory block is not flexible, you should troubleshoot, and then check the direction of rotation of the spindle from the spindle end to see if the match should rotate counterclockwise power wiring should be changed to make it consistent.


3) Before driving, cooling water for grinding workpiece can’t be in the front end of the spindle cover, to prevent the front bearing cover slot inlet burning motor and bearing. the motor must not enter the water, after turned on of the motor, when you live in grinding the workpiece to open the grinding of workpieces coolant. First off the workpiece coolant shutdown, and then close the spindle motor.




3. Maintenance and Service


1) Motorized spindle by medium frequency power supply rated voltage, frequency should be consistent with electric spindle technology parameters, motorized spindle rotational speed can change the frequency to adjust, also directly proportional voltage change.


2) When the spindle is temporarily not in use, should use compressed air to blow the coolant water,to avoid rusting, plug the hole. Spindle surface should be coated with anti rust oil. The shaft end protecting device, placed in dry place.


3) If replacement the spindle of bearings, best professional and technical personnel from the replacement. Use special tools, stator coil does not to be removed.





Shipping


===================================================================


Item will ship within 2-4 business days on payment received


We are not responsible for wrong or undeliverable address,please


Double check your address when you write in AliExpress, if you want change before we ship out.pls notice us the new address.


Delivery time :


By China post Air Mail: 45-60 days or more


By China poat air parcel :35-45 or more


By EMS :25-30 days Brazil need to more


By DHL/FEDEX :3-8 days


If the order is during the weekends,it will take 2 days longer,we are not responsible for any delay of order if we have shipped out,because the speed of shipping is out our control, thanks for your understanding. 


Payment


===================================================================


1.Before purchasing, pls confirm details with us if you have request on items.


2.Pls make payment within 3 days of the order if possible.


3.Alipay(escrow),Credit Card,Western Union,Bank TT, paypal etc are accepted.




Problem & Feedback


===================================================================


We appreciate your positive feedback and 5 stars,this item is for getting feedback rating only without any profit


If you give us the feedback after receive the goods within 3 days,will be presented the next time you purchase a beautiful gift.


1.)we care about our valued customers,and will always try to help you,hope to establish long business with you.


2.)Pls give us the opportunity to resolve any problem, we understand the concerns and frustrations you might have,and will try our best to resolve the issues.


3.)Pls contact us by Trademanager or email before leaving any negative feedback or opening any dispute on the site,we will help you to resolve the problem,




Refund


===================================================================


Any reason required for all refund. Item must be in it's original condition and no physical damage,buyer responsible for all shipping cost.


When you have the parcel,and not satisfied the goods or it is other problem like as broken,pls tell us the detail reason and provide the photos.




Contact us


===================================================================


Welcome worldwide customer inquire and questions,we will try to do our best to feedback customer’s email within 1-2 business days,if not pls check the mail box again.


Customer’s satisfaction is very important to us.



Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com