High Ratio Soft Drink Making Machine 9000L/H With CO2 Beverage for Gas carbonating plant
Quick Detail of the Gas carbonating plant
1. Capacity: 3000L/H
2. With three tanks seperately for water, CO2, syrup mixing for beverage
3. Material: SUS304
4. For carbonated drink, soft drink, beer and so on
Description of the Gas carbonating plant
QHS series carbonated drink mixer is designed and made for improving the proportion of water, syrup and carbon dioxide gas in three tanks seperately for filling machine. It adopts foreign advanced technology, static mixer to lighten water layer, increase carbonation time, assuring mixing result, CO2 recycle system will help to save consumption of CO2 and control input of oxygen.
It adopts highquality water pump and SIEMENS electrical equipment and other parts to form complete automatic control system.
It has features: coordinating action, beautiful appearance, convenient washing, high automatic level and other advantages.
It is suitable for mixing all kinds of drink, such as soda water, cola and other soft drinks. Also it can apply to thin beer, aerate for beer and produce sparkling wine.
This mixer is advanced in technology, even in mixing, reliable in performance, compact structure, easy in operation. It is suitable for aerated beverage firm of large, middle or small scale.
Main Technology data of the Gas carbonating plant
Model: QHS-3000
Production Capacity :3000kg/h
Water - Sugar mixing proportion: 3:1-10:1
Volume Ratio: more than 2.6
Intel temperature of the chilled water: 3-5 degree centigrade
Working pressure of pre-carbonization vessel and syrup vessel: 0.05-0.08MPa
Working pressure of storage vessel :0.2-0.5MPa
Power: 2.5kw
Overall Dimensions: 1500*1000*1800mm
Weight :\t400kg
1. Installation & adjustment
After the equipment are arrived at the customer's site, the customer is responsible for unpacking and arranging the equipment according to the placement drawing; and does under our install-adjust technicians' guidance. Costs of the staff are decided at last.
2. Training
1). We are responsible for offering the technical training to user. The training content includes the structure and maintenance of the equipment, control and operation of the equipment. Through training, users'technical staff can grasp and the skill of operation and maintenance proficiently, and deal with the general troubles in time. We will appoint qualified technical staff for the guidance.
2). The buyer can send staff to our company for learning.
3. Quality assurance
1). We guarantee the goods offered are brand-new, not used, with latest design and suitable material made, and we guarantee the specification of the equipment is consonance with the contract.
2). We guarantee the line achieve product technical performance indicators within 5 days after feeding operation through the correct guidance of the installation and commissioning.
3). We are responsible for the fault and damage of the production line caused by our design, technology, manufacture, installation, adjustment and material defect etc. that all belong to our responsibility.
4). The warranty period is 12 months after acceptance check of the production line. If there is any different between the furnished equipment in the customer's factory and the equipment concerned in the contract, the users have the right to pass the inspection book to the legal department to claim for compensation to our company within goods warranty period.
4. Warranty
Offer 12 months maintenance period to the problem that caused by our design, manufacture and the material quality, and offer the relevant parts and effective service for free for above reason. We will offer a widely and favorable technical support, after service all the time after guarantee period.
ZhangJiaGang City FILL-PACK Machinery Co.,Ltd. is loacated in Zhangjiagang city which is famous for beverage machinery producer collection. Intergrated the industry advantange and its own development in R&D, production, sales, after sales service, FILL-PACK is ready to serve more and more customers with our full range products and satified service.
FILL-PACK product is very critical in the choice of raw materials and spare parts. Korea 304 \\ 316 stainless steel plate, ABB, SEW motors, Siemens, Mitsubishi, OMRON electrical control components, FESTO CAMOZZ the control valve, as well as international precision machining center for the fine quality of the machine foundation.
At present we produce: production lines for mineral water, pure water, fruit juice, tea drink, milk drink and carbonated drink with capacity 1000-20000bottles/hour; production lines for vinegar, soy sauce and wine 1000-20000bottles/hour; 3-5 gallon barreled water with capacity 80-1200 barrels per hour and various water treatment plants; We provide separate machinery or turnkey project.
Our product pass quality inspection executed by Bureau of Quality and Technical Supervision every year. Our factory is in accordance with ISO9001: 2000 certification system standards and we gain CE certificate for exportation to Euro countries. Our machineries are sold to more than 30 cities in China and over cross to American, Spanish, Hungary, middle east and African countries.
We help to set up your factory as our own home with our pure heart, we do to service, we learn to support!
Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com