Поделиться:
Месяц | Минимальная цена | Макс. стоимость |
---|---|---|
Sep-19-2025 | 101150.85 $* | 106208.89 $* |
Aug-19-2025 | 100300.85 $* | 105315.20 $* |
Jul-19-2025 | 84150.33 $* | 88358.0 $* |
Jun-19-2025 | 98600.76 $* | 103530.73 $* |
May-19-2025 | 85850.95 $* | 90143.31 $* |
Apr-19-2025 | 96900.41 $* | 101745.91 $* |
Mar-19-2025 | 96050.13 $* | 100853.0 $* |
Feb-19-2025 | 95200.0 $* | 99960.68 $* |
Jan-19-2025 | 94350.98 $* | 99068.38 $* |
50 T Explosion-proof Battery Electric Locomotive For Mining
50T Battery Locomotive Parameters
Specification | CAY50/9GP | CAY50/1435GP |
Adhesive/ Total Weight(t) | 45 | 45 |
Track Gague(mm) | 900 | 1435 |
Wheelbase(mm) | 2800 | 2800 |
Wheel Diameter(mm) | 840 | 840 |
Coupler Height Over Steel Rail(mm) | 320/430 | 320/430 |
Min Curve Radius(m) | 35 | 35 |
Battery Volt Rating(V) | 540(620Ah) | 540(620Ah) |
Braking Method | Mechanical,Electrical,Air | Mechanical,Electrical,Air |
Max Tractive Effort(KN) | 123.6 | 123.6 |
Max Speed(km/h) | 30 | 30 |
Rated Speed per hour(km/h) | 8.8 | 8.8 |
Power of Traction Motor(KW) | 2*120 | 2*120 |
Tranmisson | Dual Level Gearing | Dual Level Gearing |
Controller | AC Frequency Conversion | AC Frequency Conversion |
Over all Dimensions | 8290*1500*2400 | 8290*2050*2800 |
Service& Application | Mucking in Mining& Tunneling | Mucking in Mining& Tunneling |
Professional Solution Provider For Mining Locomotive
![]() | ![]() | ![]() |
![]() | ![]() |
Locomotive Type | Model | PRICE (USD)/PC |
1.5T trolley | CJY1.5/5, 6,7,9G(B) | 6066--12057 |
3.5T trolley | CJY3.5/5, 6,7,9G(B) | 8567--14507 |
7T trolley | CJY7/6,7,9G(B) | 12987--18099 |
2.5T battery | CTY2.5/5, 6,7,9G(B) | 12076--16997 |
5T battery | CTY5/5,6,7,9G(B) | 22976--26987 |
8T battery | CTY8/6,7,9G | 27690--30885 |
2.5T diesel | KT-SQY2.5 | 8200--12200 |
3T diesel | KT-SQY3 | 8568--12568 |
3.5 diesel | KT-SQY3.5 | 9000--12223 |
Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com