Maydos эпоксидная смола хлопья подвальное напольное


Поделиться:


Цена:*

Количество:



Описание и отзывы


Трекер стоимости

Месяц Минимальная цена Макс. стоимость
Sep-17-2025 0.27 $* 0.59 $*
Aug-17-2025 0.8 $* 0.30 $*
Jul-17-2025 0.20 $* 0.11 $*
Jun-17-2025 0.83 $* 0.35 $*
May-17-2025 0.18 $* 0.17 $*
Apr-17-2025 0.8 $* 0.4 $*
Mar-17-2025 0.54 $* 0.17 $*
Feb-17-2025 0.13 $* 0.0 $*
Jan-17-2025 0.18 $* 0.36 $*

Характеристики


Company Information

 

Maydos banner

 

--Supplier of the 2008 Beijing Olympic Games.

--Over 10,000 agent shops in China

--Supplier of Top furniture company and real-estate enterprises.

--Cooperation with BASF,Akzo Nobel,etc to guarantee quality.

 

We are top 5 paint company & brand in China, 1200 workers, 25000 m2 non-dust workshop, 17 years experience , ISO certificated, 40 minutes drive from Guangzhou Airport.

We provide Paint products and Glue products,including emulsion wall paint for interior and exterior,floor paint,primer,putty,etc

 

Company address:

Sanzhou Industrial Zone, Lunjiao, Shunde, Foshan City, Guangdong Province, China

 

Cell Phone for 24 hours: +8613923296933(MR.Frank Wen)

Whatsapp&Wechat:+8613923296933 

Skype:w.frank86 

QQ:200612026

Product description

warehouse

 

 

Maydos Epoxy resin flakes basement flooring coating

 

Description:

 

JD-2000 is a two-component solvent-free epoxy floor paint. Nice appearance, dust &corrosion resistant and easy to clean. The flooring system can bond well with the solid base and has good abrasion and wearing resistance. Meanwhile, it has certain toughness, brittle-resistance and can stand a certain weight. The compressive strength and impact resistance ability is also excellent.

  

Advantages:

 

1. Seamless, dust-proof and easy to clean 

2. Solvent-free and environmental

3. Dense corrosion-resistance surface

4. Bright &smooth surface

 

Where to Use:

 

It is mainly used for the non-dusty and non-bacteria areas like pharmaceutical factory, hospital, precision machinery, electronic factory, etc.

 

  

Requirements for the base:

 

1. Concrete strength≥C25;

2. Flatness: the maximum altitude difference of 2M running rule<3mm. 

3. The moisture content of the base<4%

 

 

Technical Data:

 

Drying time:Touch dry: 2 hours/ Hard dry: 2 day
Compressive strength (Mpa)≥85
Impact resistance strength (Kg·cm)65
Flexural strength (Mpa)40
Adhesive force grade1
Pencil hardness (H)3
Abrasion resistance(750g/1000r, zero gravity, g)≤0.03
Resistance to engine oil, diesel oil for 60 daysno change
Resistance to 20% sulfuric acid for 20 daysno change
Resistance to 20% Sodium hydroxide for 30 daysno change
Resistance to toluene, ethanol for 60 daysno change
Service life8-10 years

 

 

Application System: 

20131214115115.jpg

 

Application instructions:

 

1.Surface preparation:Correct substrate preparation is critical for optimum performance. Surface should be sound, clean, dry and free from loose particles, oil, grease, and other contaminants.


2.Primer: Prepare a barrel, pour JD-D10A and JD-D10B in it based on 1:1. Stir the mixture well and then apply it with roller or trowel. The reference consumption is 0.15kg/m².The main purpose of this primer is to seal the substrate completely and avoid air-bubbles in the body coat. A second coat may be required depending on the oil absorption condition of substrate. The recoat time is about 8 hours.


Inspection standard for the primer: even film with certain brightness.


3.Undercoat: Mix WTP-MA and WTP-MB based on 5:1 first, then add quartz powder (1/2 of the mixture of A and B) into the mixture, stir it well and apply with trowel. The consumption quantity of A and B is 0.5kg /sqm. You can do it one coat at one time or two coats at two times. In the second case, the application interval is about 8 hours at 25 degrees. Sand the first layer, clean it and then apply the second layer. After the whole application, wait another 8 hours, grind it, clean the sanding dust and then continue the next procedure.

 

Inspection standard for the undercoat: Non-sticky to hand, no softening, no nail print if you scratch the surface.

 

4. Top coat: Mix JD-2000A and JD-2000 B based on 5:1 and then apply the mixture with spatula. The consumption quantity is 1.0kg/sqm.

 

5. Maintenance: 5-7 days. Don’t put the floor into use or wash it with water or other chemicals.

 

Color Chart:

 

Color chart of Maydos epoxy floor paint-2

 

Epoxy project cases

 

3D epoxy cases

Self-leveling project cases 

Packing & Shipping

Packing

 

 SC1TP1C2MH$TUBT~(A%W91

 

 

.jpg

 

 

WOOD PALLET

 

 

IMG_0200

 

Container Loading

 

QQ20150701162944

 

 

 

Our Services

Why Choose us?

1.One of the top 5 Chemical Company in China.

2.Rich experience in Transport of Chemical liquid goods.

3.Response timely with professional workable advise.

4.Wide range of chemical product provided,your best one-step purchase choice.

5.site Instruction by engineer.

6.OEM Service Provided.

7.Free Sample For Test.

OEM Service 

Other Imformation

Our Factory

 

 

Certificate

ISO 9001 and 14001 certificates

  

Other Products

 

EP-2

1 


Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com