Low Cost Gold Elution Machine Processing Plant And Electrowinning Cell


Поделиться:


Цена:10 000,00 $ - 11 000,00 $*

Количество:



Описание и отзывы


Трекер стоимости

Месяц Минимальная цена Макс. стоимость
Sep-16-2025 11900.43 $* 12495.49 $*
Aug-16-2025 11800.61 $* 12390.27 $*
Jul-16-2025 9900.38 $* 10395.80 $*
Jun-16-2025 11600.95 $* 12180.96 $*
May-16-2025 10100.94 $* 10605.33 $*
Apr-16-2025 11400.57 $* 11970.63 $*
Mar-16-2025 11300.95 $* 11865.81 $*
Feb-16-2025 11200.33 $* 11760.88 $*
Jan-16-2025 11100.0 $* 11655.5 $*

Характеристики


Low Cost Gold Elution Machine And Electrowinning Cell Device , Gold Extracting Processing Plant



Product Description


Gold Elution Plant —Introduction




Desorption electrolysis system is applied to recover solid gold from carbons in the cyaniding process. It is equipped with liquid-level controlling system, temperature controlling system and automatic controlling system.


Application:Desorption electrolysis system is applied to recover solid gold from carbons in the cyaniding process.


3323.jpg



Product Feature


Gold Elution Plant —Features





  1. High-efficiency: when the grade of loaded carbon reaches 3000g/t, the desorption rate can reach more than 96%, the barren carbon tenor with this equipment comparing with that of normal desorption electrowinning equipment will reduce to its one/ fourth.

  2. Rapid: the temperature of desorption electrowinning can reach as high as 150°C(generally 30-55°C higher than in other kind system), and the working pressure of system can reach as high as 0.5 Mpa (generally 0.2-0.5 Mpa higher than in other kind system), so the desorption electrowinning is rapid with 12 hours typically(50%-60 % time shorted).

  3. Low consumption: the same temperature for desorption, no need of heat-exchanging, working speed is rapid, power consumption is 1/2-1/4 of normal system.-3 (4).jpg



Work Principle


Gold Elution Plant —Working principle




When the desorption system is added with anions which are more easily absorbed by activated carbons, Au(CN)2 is replaced by anion and the gold desorption is achieved. After the carbons loaded with gold are desorbed, pregnant solution is process via ionization. At last, solid gold is attained.


CILCIP.jpg



Technical Parameters


Gold Elution Plant —Technical parameters



























































Model



Applicable scale



Detail of system equipment



System instrument detail



Operating Parameters



scale of mine (t/d)



ore grade(g/t)



 



 



 



GKJD-200



<150



2-8



JXZ Desorption column
GLQ 
filter
DJC 
electrolytic cell
CQ 
circulating pump
DRQ 
electric heater   Wair compressor
PYC 
Desorption liquid trough   XL control cabinet
GDF 
Rectifier cabinet



resistance diaphragm pressure gauge

Pressure indicating controller

Diaphragm pressure gauge

Vortex flow meter

Flow totalizer thermal thermometer

Temperature sensor for liquid level meter

Temperature indicating regulator



Temperature:150±2OC
PH
:13.5
Flow
:2.4m3/h
Current
:300±100A
D
ecomposition voltage:2-4V
I
nstalled power:75.6(KW)
Desorption trough pressure :0.5-0.57 (Mpa)
Cell pressure:0.45-0.52 (Mpa)



GKJD-300



150-300



GKJD-500



300-500



GKJD-700



500-750



GKJD-900



750-1000



GKJD-1000



1000-1500



GKJD-1200



1000-1500



GKJD-1500



>1500





About Xinhai


-1.jpg


-2.jpg


-3.jpg





Contact Us


.jpg


Your email address and telephone will not be shared or published!


Please fill in the equipment,ore and capacity that you need and do not forget mail and phone if you like to be contacted.


 


Please click "send" to contact us




Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com