Go зеленый холодный асфальт в мешках Мгновенный ремонт дороги


Поделиться:


Цена:*

Количество:



Описание и отзывы


Трекер стоимости

Месяц Минимальная цена Макс. стоимость
Sep-16-2025 0.42 $* 0.33 $*
Aug-16-2025 0.18 $* 0.46 $*
Jul-16-2025 0.93 $* 0.58 $*
Jun-16-2025 0.8 $* 0.44 $*
May-16-2025 0.28 $* 0.80 $*
Apr-16-2025 0.19 $* 0.52 $*
Mar-16-2025 0.94 $* 0.69 $*
Feb-16-2025 0.85 $* 0.30 $*
Jan-16-2025 0.71 $* 0.32 $*

Характеристики


Go Green cold asphalt in bags/Instant road repair cold asphalt material 

 

Product Description.png

 

Go Green Superior Cold Mix Asphalt is a Superior Permanent Road maintenance material, uses a high performance polymer formulated to guarantee its good workability, applicable in all weather conditions and can works in water, repair both asphalt and concrete driveway, no tools needed, accept traffic immediately after installation.

 

Application Range

 

Go Green cold mix asphalt is best choice to repair potholes, utility cuts, road edges, water main breaks, also be utilized as permanent asphalt patch, trench reinstatements, man hole adjustments.

 

Go Green cold mix asphalt can repair both concrete and asphalt road easily.

 

^BC481F9068EF59775717C30DB6C70C7032F8E0B0E89351A660^pimgpsh_fullsize_distr.jpg

 

Outstanding Features:

 

1. All weather to use

2. Applicable for rainy and snowy

3. Used in concrete or bituminous pavements

4. No need tar coating material

5. Permanent repair, no need to maintenance at least 10 years 

6. Construction is simple, open to traffic soon

7. Working temperature is -25℃ to 50℃

8. Shelf life unopen 2 years

9. 100% eco-friendly, cold mixing

 

Packages are available in 20kg bag, 20kg bucket and 1 ton bag

 

1 (2).png

 

 

How to Use.png

 

-01_.jpg

 

Step 1 Clear

 

Sweep the base of the pothole of any loose debris by sweeping or raking. Ensure that no large loose rocks are present in the pothole before pothole repair step 2.

 

Step 2 Pour

 

Fill the pothole with Go Green cold mix asphalt. Recommended compacted depth is 50mm. If area is deeper than 50mm, compact in layers (no deeper than 50mm per layer).

 

Step 3 Tamp

 

When hole is filled, apply a small crown to repair area to allow for additional compaction. Now tamp, or wheel roll for the final time , and you may now open to traffic – immediately!! It’s that simple.

 

Container Loading.png

 

One container can load 1000 pieces of 20kg bags, 48 pieces of 20kg bucket or 20 ton bags.

 

^2602CA6727071BF66647883182BFB15F58DC58E4B6BD54A199^pimgpsh_fullsize_distr.jpg

 

 

Certification.png

 

-01.jpg

^5FB8C6F47C06228B88A0B4EAD5C7AA255962C4E42FA699F116^pimgpsh_fullsize_distr.jpg

 

Our Company.png

 

^2794C7954CAC14D2353EA517F03A4E5FAC8386A6533058EDD9^pimgpsh_fullsize_distr.jpg

 

Our Market.png

 

-1.jpg

Our Service

 

^A209B1E77A7B21EDE31344118C406843FD13510853C2304B1C^pimgpsh_fullsize_distr.jpg

 

Welcome to contact us, we will reply to any of your question at the earliest time.

 


Похожие товары

Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com