Поделиться:
Месяц | Минимальная цена | Макс. стоимость |
---|---|---|
Sep-16-2025 | 0.28 $* | 0.9 $* |
Aug-16-2025 | 0.89 $* | 0.88 $* |
Jul-16-2025 | 0.31 $* | 0.63 $* |
Jun-16-2025 | 0.40 $* | 0.2 $* |
May-16-2025 | 0.21 $* | 0.22 $* |
Apr-16-2025 | 0.7 $* | 0.88 $* |
Mar-16-2025 | 0.6 $* | 0.85 $* |
Feb-16-2025 | 0.23 $* | 0.91 $* |
Jan-16-2025 | 0.79 $* | 0.10 $* |
Item | Gear Shift Knob | |||
Main Equipment | CNC Machining center 3,4 and 5 axis (Haas Fanuc Brther), CNC lathe(CITIZEN,Tsugami), Grinding machine, Cylindrical grinder machine, Drilling machine, Laser cutting machine, EDM machine, etc. | |||
Material | Aluminum, Stainless steel, brass, copper, carbon steel, beryllium copper, titanium alloy, plastic, etc. | |||
Processes | CNC turning, CNC milling | |||
Surface Treatment | Anodizing, Knurling, Brush, Sand blasting, High polished, Plating, Powder coating, Painting, Electroplating, Silk screen, Engrave, etc. | |||
Inspection Equipment | Callipers, Micrometer, altimeter, CMM(3D coordinate measuring machine PC dmis), Dantsin TRIMOS V5 2.0 D measurement Instrument, go-no go gauges, Thread gauge | |||
Tolerance | ±0.003 | |||
QC Control | 100% inspection before shipment | |||
Drawing format | JPG, PDF, CAD, DWG, STP, STEP, IGS | |||
Lead time | 3-5 working days for samples, 10-20 days for mass production | |||
Packaging | Regular: Paper, Foam, PE bag, EPE form, Carton; Other: According to customers' requirements | |||
Payment Terms | 50% T/T in advance, 50% balance before shipment |
Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com