Высококачественные тележки для подземных шахт локомотивы взрывозащищенный Электрический узкий манометр Локомотивы


Поделиться:


Цена:8 000,00 $ - 10 000,00 $*

Количество:



Описание и отзывы


Трекер стоимости

Месяц Минимальная цена Макс. стоимость
Sep-17-2025 9520.89 $* 9996.18 $*
Aug-17-2025 9440.73 $* 9912.42 $*
Jul-17-2025 7920.21 $* 8316.97 $*
Jun-17-2025 9280.12 $* 9744.54 $*
May-17-2025 8080.25 $* 8484.69 $*
Apr-17-2025 9120.10 $* 9576.95 $*
Mar-17-2025 9040.46 $* 9492.86 $*
Feb-17-2025 8960.97 $* 9408.34 $*
Jan-17-2025 8880.60 $* 9324.87 $*

Характеристики





Product Paramenters




Specification/ Model
CJY7/6GP
CJY7/7GP
CJY7/9GP
CJY10/6GP
CJY10/7GP
CJY14/6GP
CJY14/7GP
CJY14/9GP
weight (ton)
7
7
7
10
10
14
14
14
Track gauge (mm)
600
762
900
600
762
600
762
900
Wheelbase (mm)
1100
1100
1100
1100
1100
1700
1700
1700
Wheel diameter (mm)
680
680
680
680
680
680
680
680
Height btw connector & track surface (mm)
320/430
320/430
320/430
320/430
320/430
320/430
320/430
320/430
Min curve radius (m)
7
7
7
7
7
15
15
15
Pantograph (mm)
1800-2200
1800-2200
1800-2200
1800-2200
1800-2200
1800-2400
1800-2400
1800-2400
Braking mode
Mechanic + electric
Mechanic + electric
Mechanic + electric
Mechanical+Electrical
Mechanical+Electrical
Mechanic + electric+Air
Mechanical+Electrical+Air
Mechanical+Electrical+Air
Max traction (kN)
19.2
19.2
19.2
27.5
27.5
38.5
38.5
38.5
Max speed (km/h)
20
20
20
20
20
25
25
25
Rated speed (km/h)
10
10
10
10
10
10
10
10
Power of motor (kW)
2 * 22
2 * 22
2 * 22
2*22(30)
2*22(30)
2*37
2*37
2*37
Voltage(V)
DC250/550
DC250/550
DC250/550
DC250/550
DC250/550
DC550
DC550
DC550
Driving method
spur gear
spur gear
spur gear
spur gear
spur gear
spur gear
spur gear
spur gear
Speed adjust
AC frequency change
AC frequency change
AC frequency change
AC Frquency Conversion
AC Frquency Conversion
AC frequency change
AC Frquency Conversion
AC Frquency Conversion
Controller

Resistance or IGBT
Resistance or IGBT
Resistance or IGBT
Resistance or IGBT
Resistance or IGBT
Resistance or IGBT
Resistance or IGBT
Transmission
Single Level Spur Gearing
Single Level Spur Gearing
Single Level Spur Gearing
Single Level Spur Gearing
Single Level Spur Gearing
Dual Bevel Gearing
Dual Bevel Gearing
Dual Bevel Gearing
Dimension(L*W*H)(mm)
4460 * 1060 * 1590
4400 *1340 *1590
4400 * 1340* 1590
4460*1060*1590
4460*1340*1590
5250*1060*1750
5250*1340*1750
5300*1340*1750
Service & Application
Mucking in Mining&Tunneling
Mucking in Mining&Tunneling
Mucking in Mining&Tunneling
Mucking in Mining&Tunneling
Mucking in Mining&Tunneling
Mucking in Mining&Tunneling
Mucking in Mining&Tunneling
Mucking in Mining&Tunneling


Products Description






Electric Trolley Underground Mining Locomotive using DC electrical line, DC transformed to three phase AC by computer traction transformer, the voltage and frequency can be adjusted, which can drive two AC asynchronous motor, by reduction gear driving axle to tract locomotive.
The core parts of traction transformer using 32 digital DSP chip, fast speed with quick response.
Have good sticking and big traction.
Reliable AC electrical motor, with wide range of speed regulation.
Less cost for maintenance, can avoid ring fire and burnt compared to DC driving.
The Electric Trolley Underground Mining Locomotives are suitable for transportation traction on the narrow rail for the field of coal, metallurgical industry, mining, forest, railway, road tunnel construction and etc.
Locomotive can be used elevation within 2000m, metal mine or non-hazardous area.
zmwm15


Details Images








Company Profile






Our Advantages




FAQ


1. You are a manufacturing factory or trading company?
China Coal Group is a manufacturing factory base of mines support equipment, transport equipment, lifting equipment, spray equipment, drilling equipment, ventilation equipment and other products.

2. Where is your factory located?
Currently we have one factories in China. One located in Jining, Shandong Province, China . You are warmly welcome to visit us at any time.

3. What are your main products?
We mainly produce mining machinery and railway equipment. We can provide you with any machinery you need!

4. How long is the production leadtime?
Generally it is 15-20 days for goods in stock. In the case of out of stock or large orders, it will take 20-30 days. QTY of the orders will be taken into consideration.

5. What payment terms do you accept?
Payment terms: TT in advance (30% of deposit before production and 70% balance before shipment), bank transfer, Paypal, L/C etc.

6. How do your quality control systems operate?
We have professional designer team, and employ experienced engineers to strictly guarantee the production. Meanwhile our factory owns ISO9001 and is CE and SGS certified.


Похожие товары

Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com