Поделиться:
Месяц | Минимальная цена | Макс. стоимость |
---|---|---|
Sep-17-2025 | 0.58 $* | 0.88 $* |
Aug-17-2025 | 0.50 $* | 0.61 $* |
Jul-17-2025 | 0.15 $* | 0.95 $* |
Jun-17-2025 | 0.81 $* | 0.49 $* |
May-17-2025 | 0.69 $* | 0.50 $* |
Apr-17-2025 | 0.82 $* | 0.96 $* |
Mar-17-2025 | 0.58 $* | 0.21 $* |
Feb-17-2025 | 0.33 $* | 0.97 $* |
Jan-17-2025 | 0.28 $* | 0.89 $* |
ZG300 Crawler Water Well Drilling Rig Specification | ||||||
The weight (T) | 7.2 | Drill pipe diameter (mm) | Φ76 Φ89 Φ102 | |||
The hole diameter (mm) | 140-325 | Drill pipe length (m) | 1.5m 2.0m 3.0m | |||
Drilling depth (m) | 300 | Rig lifting force (T) | 18 | |||
One-time advance length (m) | 3.3/4.8 | Rapid rise speed (m/min) | 22 | |||
Walking speed (km/h) | 2.5 | Fast feeding speed (m/min) | 40 | |||
Climbing angles (Max.) | 30 | Width of loading (m) | 2.7 | |||
Equipped capacitor (kw) | 85 | Hoisting force of winch (T) | 2 | |||
Using air pressure (MPA) | 1.7-3.0 | Swing torque (N.m) | 5700-7500 | |||
Air consumption (m3/min) | 17-36 | Dimension (mm) | 4100×2000×2500 | |||
Swing speed (rpm) | 40-70 | Equipped with hammer | Medium and high wind pressure series | |||
The penetration efficiency (m/h) | 15-35 | High leg stroke (m) | 1.4 | |||
The engine brand | Yuchai engine |
Item | ZG180 | ZGX200 | ZG260 | ZG280 |
Drilling Depth(m) | 180 | 200 | 260 | 280 |
Drilling Diameter(mm) | Φ140-254 | Φ140-254 | Φ140-305 | Φ140-305 |
One-Time Advance Length(m) | 3.3 | 3.3 | 3.3 | 6.6 |
Walking Speed(km/h) | 2.5 | 2.5 | 2.5 | 2.5 |
Climbing Angles(°) | 30 | 30 | 30 | 30 |
Engine & Power(kw) | 60 | 65 | 70 | 75 |
Air Consumption(m3/min) | 17-31 | 17-31 | 17-31 | 17-31 |
Drill Pipe Length(m) | 1.5/2.0/3.0 | 1.5/2.0/3.0 | 1.5/2.0/3.0 | 1.5/2.0/3.0 |
Drill Pipe Diameter(mm) | Φ76 Φ89 | Φ76 Φ89 | Φ76 Φ89 | Φ76 Φ89 |
Rig Lifting Force(T) | 12 | 13 | 15 | 17 |
Swing speed(rpm) | 45-70 | 45-70 | 45-70 | 40-70 |
Swing torque(N.m) | 3200-4600 | 3400-4700 | 4000-5300 | 4500-6000 |
Dimensions(mm) | 4000*1630*2250 | 3950*1750*2250 | 4000*1850*2300 | 5900*1850*2360 |
Weight(kg) | 5200 | 5000 | 6500 | 7600 |
Item | ZG300 | ZGX350 | ZG380 | ZG450 |
Drilling Depth(m) | 300 | 350 | 380 | 450 |
Drilling Diameter(mm) | Φ140-325 | Φ140-325 | Φ140-325 | Φ140-350 |
One-Time Advance Length(m) | 3.3/4.8 | 6.6 | 6.6 | 6.6 |
Walking Speed(km/h) | 2.5 | 2.5 | 2.5 | 2.5 |
Climbing Angles(°) | 30 | 30 | 30 | 30 |
Engine & Power(kw) | 85 | 92 | 96 | 103 |
Air Consumption(m3/min) | 17-36 | 17-36 | 17-36 | 17-36 |
Drill Pipe Length(m) | 1.5/2.0/3.0 | 1.5/2.0/3.0/6.0 | 1.5/2.0/3.0/6.0 | 1.5/2.0/3.0/6.0 |
Drill Pipe Diameter(mm) | Φ76 Φ89 Φ102 | Φ89 Φ102 | Φ89 Φ102 | Φ89 Φ102 |
Rig Lifting Force(T) | 18 | 22 | 24 | 25 |
Swing speed(rpm) | 40-70 | 66-135 | 66-135 | 50-135 |
Swing torque(N.m) | 5700-7500 | 6200-8500 | 6500-9000 | 7000-9500 |
Dimensions(mm) | 4100*2000*2500 | 6000*2000*2550 | 5950*2100*2550 | 5900*1850*2360 |
Weight(kg) | 7200 | 8600 | 9200 | 9400 |
Item | ZG500 | ZGX580 | ZG680 | ZG800 |
Drilling Depth(m) | 500 | 580 | 680 | 800 |
Drilling Diameter(mm) | Φ140-350 | Φ140-350 | Φ140-400 | Φ140-400 |
One-Time Advance Length(m) | 6.6 | 6.6 | 6.6 | 6.6 |
Walking Speed(km/h) | 2.5 | 2.5 | 2.5 | 2.5 |
Climbing Angles(°) | 30 | 30 | 30 | 30 |
Engine & Power(kw) | 118 | 132 | 153 | 194 |
Air Consumption(m3/min) | 17-42 | 17-42 | 17-42 | 17-42 |
Drill Pipe Length(m) | 1.5/2.0/3.0/6.0 | 1.5/2.0/3.0/6.0 | 1.5/2.0/3.0/6.0 | 1.5/2.0/3.0/6.0 |
Drill Pipe Diameter(mm) | Φ102 Φ108 Φ114 | Φ102 Φ108 Φ114 | Φ102 Φ108 Φ114 | Φ102 Φ108 Φ114 Φ117 |
Rig Lifting Force(T) | 26 | 28 | 30 | 36 |
Swing speed(rpm) | 40-130 | 45-140 | 45-140 | 45-140 |
Swing torque(N.m) | 7500-10000 | 8500-11000 | 8850-13150 | 9000-14000 |
Dimensions(mm) | 6200*2200*2650 | 6200*2200*2650 | 6300*2300*2650 | 6300*2300*2650 |
Weight(kg) | 11500 | 12000 | 13000 | 13000 |
Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com