Уплотнитель для асфальтовой дорожки с холодным распылением уплотнительное покрытие песком улучшения


Поделиться:


Цена:*

Количество:



Описание и отзывы


Трекер стоимости

Месяц Минимальная цена Макс. стоимость
Sep-20-2025 0.91 $* 0.26 $*
Aug-20-2025 0.8 $* 0.86 $*
Jul-20-2025 0.51 $* 0.33 $*
Jun-20-2025 0.72 $* 0.63 $*
May-20-2025 0.4 $* 0.57 $*
Apr-20-2025 0.66 $* 0.59 $*
Mar-20-2025 0.99 $* 0.58 $*
Feb-20-2025 0.75 $* 0.97 $*
Jan-20-2025 0.4 $* 0.50 $*

Характеристики



Product Description


Go Green sand mix driveway sealer is a new type of high-performance black-bright ultra-micro finish material. The high-performance dual-mode emulsified asphalt is used as the cementitious material, the super black anti-skid material is used as the aggregate, and the liquid mixture formed by adding super black modifier, super black wear-resistant filler, egenerant, etc., can be directly sprayed for construction at room temperature. The ultra-fine surface material has the characteristics of rapid demulsification and high wear resistance, which can effectively supplement the scattered pavement, missing asphalt and fine aggregate, and reduce the frequency of loose and aging pavement problems. At the same time, the anti-skid performance of the pavement is enhanced, water disasters are avoided, and the purpose of protecting the pavement structure and prolonging the service life of the pavement is achieved. It is a cost-effective preventive maintenance measure.




Application


It is suitable for preventive maintenance of various asphalt pavements such as highways, national and provincial trunk roads, municipal roads and facilities, airports, bridges, etc., as well as the repair of pavement appearance and function.


Construction Guide


Small areas can be manually scraped or constructed with real stone paint equipment, and large areas can be constructed with spray trucks. Calculate the spraying amount according to the road conditions, put the mixture containing the sand mist seal layer into the spraying truck or the real stone paint equipment, adjust the equipment and control the dosage.

1. Before Construction, the road surface should be cleaned, oil stains and loose parts should be removed to ensure that the road surface is dry and free of floating dust, and the spraying amount should be determined according to the road surface condition;

2. The road surface is smooth, dense, slightly water seeped, and slightly loose hemp surface: single-layer spraying is used, and the spraying amount is 0.9-1.2kg/m2 (finished material);

3. The surface of the pavement is rough, heavy water seepage, large porosity, heavy loose hemp surface and oil-poor: use double-layer spraying, the first layer spraying amount is 0.7-1.0kg/m2 (finished material), the second layer is The amount of layer spraying is 0.5-0.8kg/m2 (finished material). The second coat should be applied after the first coat is dry (about 30 minutes);

4. The mixture can be constructed by spraying with real stone paint equipment, manual paving or spraying with special vehicles, and after demulsification molding, a sand-containing mist seal layer is formed. Only when the road surface is dry and non-stick test paper is allowed to open to traffic. The general curing time is 2-3 hours when the ambient temperature is higher than 15°C and the air humidity is less than 70%.





Technical Specification


Technical Index
Technical Requirement
 Testing Data
Testing Method
Uniformity
No Lumps or Sedimentation
After Stirring
No Lumps or Sedimentation
Visual Inspection
Stormer Viscosity (25℃, KU)
>55
107
GB/T 9269-2009
Evaporation Residue Content (%)
≥60
62.5
T06511
PH
≥6.0
7.6
HJ 1147-2020
Normal temperature storage performance
≤1
0.3
T06561
Sand Content, %
>25
30
400 Mesh Filter
2h Cohesion, N.m
≥2
2
7.1.3²


Project Cases




Packing & Delivery


25kg/bucket, 200kg/drum
4 drums in a pallet, 80 drums in a 20'FCLShelf life unopen 3 years


Company Profile




Go Green Industrial (Shanghai) Co., Ltd is a foreign invested company with two factories in China and R&D center is located in Australia.

We are committed to the development and production of high performance environmental-friendly road maintenance materials. Products including supeiror cold mix asphalt, micro paving asphalt layer, asphalt pavement sealer, cold pourable crack filler, colorless asphalt binder, color asphalt series, pigments, porous asphalt materials, asphalt emulsion and additives etc.

Go Green products have been exported to more than 45 countries around the world and received high praise from the foreign governments. "Go Green" has become the global famous brand in road maintenance materials.


FAQ


1. who are we?
We are based in Shanghai, China, start from 2010,sell to Domestic Market(30.00%),Mid East(18.00%),Oceania(10.00%),Africa(10.00%),Southeast Asia(10.00%),North America(5.00%),South Asia(5.00%),South America(5.00%),Northern Europe(3.00%),Western Europe(2.00%),Eastern Asia(2.00%). There are total about 51-100 people in our office.

2. how can we guarantee quality?
Always a pre-production sample before mass production;
Always final Inspection before shipment;

3.what can you buy from us?
cold mix asphalt, asphalt sealer, color asphalt, iron oxide pigment,crack repair, bitumen additives etc.

4. why should you buy from us not from other suppliers?
Unique Technology, independent research and development

5. what services can we provide?
Accepted Delivery Terms: FOB,CFR,CIF,Express Delivery;
Accepted Payment Currency:USD;
Accepted Payment Type: T/T;
Language Spoken:English,Chinese


Похожие товары

Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com