Переработанные отходы пластик pp pe hdpe


Поделиться:


Цена:*

Количество:



Описание и отзывы


Трекер стоимости

Месяц Минимальная цена Макс. стоимость
Sep-16-2025 0.29 $* 0.61 $*
Aug-16-2025 0.9 $* 0.91 $*
Jul-16-2025 0.60 $* 0.2 $*
Jun-16-2025 0.98 $* 0.38 $*
May-16-2025 0.94 $* 0.44 $*
Apr-16-2025 0.21 $* 0.22 $*
Mar-16-2025 0.23 $* 0.6 $*
Feb-16-2025 0.88 $* 0.62 $*
Jan-16-2025 0.8 $* 0.25 $*

Характеристики



              


       hdpe film granulating machine New


.jpg


1. Machine Introduction


1. Recycle the waste materials and leftover bits and pieces of various flexible plastic films, bags, filament, 


ribbons, pieces, and pipes such as polyvinyl chloride, polypropylene chloride, polyethylene of higher density, 


and linear polyethylene of lower density, and put them into reproduction.


2. Milling, mixture and staining can be processed all in one.
3. Granulate at lower temperature, don't damage molecular structure of materials basically, and don't damage 


physical performance. 


 


2. Machine Advantages


1, Motor with CE standard has more than 10 years life.


2, Electric parts is CHINT, the best supplier in China.


3, There are 4 pcs fixed knives and 6 pcs moving knives.


4, The materials of knife is hard steel with alloy.


5, Air cylinder is Airtac, which is Taiwan Brand.


6, There is water pump to cool.


 


3. Machine Parameters









































Cylinder capacity



150L



100L



Capacity 



60~80kg/h



30~60kg/h



Main Motor Power



18.5kw



15kw



Water plant



125w



125w



Heating power



1.5kw



1.5kw



Spindle Speed



660r/min



660r/min



Machine Dimension



1500×700×1400mm



1300×600×1300mm



 


 4. Machine Details   



 


5. Machine Packing & Loading


.jpg


 We also have other products, If you interest, Please Click it 


Film blowing machine


Plastic bag making machine


Printing machine


Recycling machine


 328pin1(a)


1,Q: Your factory is trading company or factory?


A: We are factory. We have more 2100 square meter workshop and 23 workers containing the 2 installment engineer and 1 electric engineer.


We are Factory, so we have cost advantage than others


 


2, Q: How do your company control the machine quality?


A: First we control the raw materials quality.


Second, we control the quality of machine when we are processing.


Third, Our installment engineer will test machine.


 


3, Q: How about payment term, payment safety and delivery time?


A: We accept 30% deposit, balance before shipment. And Irrevocable L/C at sight.


Delivery time is 20 to 30 days. It is according to order quantity.


 


4,Q: What is your company after sale service?


A: Our installment engineers are available. Normally it will take about 7 to 10 days for all.


Our guarantee is one year. If there is any spare parts is broken, we can send them freely to you.


 14 CONTACT US


 


 


 


 


 


Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com