Поделиться:
Месяц | Минимальная цена | Макс. стоимость |
---|---|---|
Sep-19-2025 | 1071.65 $* | 1125.41 $* |
Aug-19-2025 | 1062.53 $* | 1115.36 $* |
Jul-19-2025 | 891.85 $* | 936.30 $* |
Jun-19-2025 | 1044.58 $* | 1096.63 $* |
May-19-2025 | 909.6 $* | 954.93 $* |
Apr-19-2025 | 1026.3 $* | 1077.63 $* |
Mar-19-2025 | 1017.37 $* | 1068.48 $* |
Feb-19-2025 | 1008.68 $* | 1058.20 $* |
Jan-19-2025 | 999.64 $* | 1049.86 $* |
Recommended by sellers
![]() | ![]() | ![]() |
![]() | ![]() | ![]() |
![]() | ![]() |
Free shipping to the Philippines for 50-100m water well drilling rigs
Precautions for operation and use of drilling rig
1. Please fill 46# hydraulic oil in the oil tank and gear oil in the reduction box before use. It is strictly forbidden to use the equipment without oil filling.
2. Digging a reservoir: Dig a reservoir with a diameter greater than 1.5 square meters and a depth of 1 meter at a distance of about four meters from the wellhead (the distance can also be determined according to the actual terrain and the length of the water pipe), and use a wooden pole to pump the pressure pump Hang it horizontally in the pool (it is advisable to cover the water pump on a horizontal plane) and connect the other end of the water pump pipe to the upper water injector of the drilling rig.
3. Use the 380V power supply to connect the drill oil pump motor, the reverse switch power supply, and the spindle motor, and install the water pipe at the water injector interface to connect the water source of the pump.
4. When actually operating the drilling rig, choose the location of the well, choose the location of the wellhead, and use a shovel to dig a wellhead with a depth of 30-50cm and a diameter of 10-30cm. Move the rig over the wellhead to align it. The soil surface layer at the position of the drilling hole is required to be dense, and there should be no overhead phenomenon of bricks, gravel and firewood below, so as to avoid water seepage, landslide, subsidence and other phenomena during the drilling operation, which will cause hidden dangers. Square wood can be laid. Reinforce the base.
5. Start up: After power-on, let the oil pump motor circulate oil for two minutes to make the oil pressure in each oil pipe reach the working state.
6. Connect the drill bit and the drill pipe tightly. When using, control the oil cylinder to raise the height of the main engine by operating the valve handle. The other person cooperates with the drill pipe with the drill bit in section yi, and operates the handle to lower the height of the main engine. The lifting speed can be controlled by adjusting the pressure reducing valve. The other person cooperates with the hand drill pipe to slowly put the drill bit through the base hole into the drilling hole, straighten it vertically, start the drilling rig and the water pump, and the drill pipe will be driven into the ground when it rotates.
To replace the drill pipe:
After driving in the first section of drill pipe, insert the rod unloading wrench, operate the reverse switch to rotate the drill pipe counterclockwise, lift the spindle head and separate it from the drill pipe by operating the valve handle, lift the head, and then take another drill pipe, manually Rotate the upper wire to connect the machine head, the lower end joint is connected, turn on the reverse switch clockwise to tighten the drill rod, remove the rod unloading wrench, turn on the machine and rotate clockwise to continue drilling. In this way, the above actions can be repeated repeatedly. Find the ideal water-bearing geological sand layer according to your desired depth.
Unloading the drill pipe:
After the drill pipe descends to the aquifer of the ideal depth, note the depth of the water-bearing sand layer, stop the drilling rig, and only turn on the water pump to flush the well with water pressure. First, insert the rod removal wrench, and through the reverse switch, the reverse transfer head is separated from the drill rod. Secondly, press the lifter on the machine head, tighten it, lower the machine head and align the lifter with the drill pipe on the base into the groove, rotate the buckle and hang it up and lift it up, when the lower end joint of the drill pipe rises to the machine base Stop when the safety cover is above, close the safety cover, insert the rod-removing wrench, turn it upside down, the drill pipe will be automatically removed, and then it can be removed immediately. Repeat the operation to remove the remaining drill rods.
Drilling machine overall dimension(mm) | 700*700*2500 |
Weight of Drilling machine(kg) | 200 |
Drill rod diameter(mm) | 42-220 |
Drill rod length(mm) | 1500 |
Rod change method | Full automatic screw thread |
Drilling depth(m) | 100 |
Engine | 5kw/3800v |
Drilling method | Percussive and rotating type |
Pump power(KW) | 3KW |
Drilling hole diameter(mm) | Within Ø 200mm |
Hosting height(mm) | 2000 |
Hosting capacity(kg) | 500 |
Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com