Installation Precautions: The controller unit and other cables must be installed separately from the high voltage ignition cables.
Do not confuse phase and neutral.
Install switches, fuses, grounding, etc. in accordance with local regulations.
Connection diagram showing the application of a grounded neutral wire to the burner control. Ionization current monitoring in the network without connection
In the case of a ground conductor, terminal 2 must be routed through an RC unit (Type:
ARC 4 668 9066 0). Connect the ground wire. Local regulations must be followed (e.g. protection against electric shock)
Because the mains voltage of AC 230 V / 50 Hz produces a current leakage of up to 2.7 mA.
Verify that the maximum amount of current allowed by the terminal is not exceeded.
Do not supply an external mains voltage to the control output of the combustion controller, when the test unit controls the combustion controller (fuel
valve, etc.), LME do not connect.
In the absence of a fan, the AGK25 must be connected to terminal 3, otherwise the burner will not start reliably.
For safety, connect the neutral conductor to terminal 2. As shown below, the burner components (fan, ignition
compressor, air valve) must be connected to the neutral conductor. The connection between the neutral conductor and terminal 2 is at the control unit
The bottom is pre-wired.